Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan 281-483-3729.

Similar presentations


Presentation on theme: "Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan 281-483-3729."— Presentation transcript:

1 Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan david.kaplan@jsc.nasa.gov 281-483-3729

2 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment Is it safe? Is it built right? Will it work?...throughout its lifetime?

3 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment

4 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan S AFETY for both PIH and Experiment Milestones: Flight Safety Review – Phase IIDecember 2004 Ground Safety Review – Phase IIApril 2005 Flight Safety Review – Phase IIIApril 2006 Ground Safety Review – Phase IIISeptember 2006 Process: Payload Safety Review Panel [PSRP]  point-of-contact: NC/Chuck Bailey Action: Preparation of all Safety Data Packages is the responsibility of Lockheed Martin Space Operations (LMSO)

5 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment

6 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan ASSURANCE and RELIABILITY for PIH Quality Engineering Quality Assurance Evaluate Project Requirements Evaluate Manufacturing/Fabrication Plans and Processes Define Inspection Requirements Approve Testing Investigate Non-conformances and Mishaps Support System Acceptance Reviews (SAR's) Conduct Pre-Shipment Readiness Reviews Manufacturing Inspections Test Verification Program Stock Control Discrepancy Reporting Metrology Process Assurance Monitoring Clean Room and Laboratory Services QARC Document Processing and Maintenance Procurement Quality Assurance Fastener and Materials Testing Software Assurance Analyze Software Requirements Evaluate Software Design Approve Testing/Certification Reliability Assurance Evaluate Project Requirements and Verifications Approve Testing/Certification Investigate Nonconfomances and Failures Support Requirements and Design Reviews Establish minimum reliability goals

7 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan CoFR Endorsements Endorsement PIHExperimentComment Certification YesSafety Only Limited Life YesYes* Hazards, FMEA’s Yes Flight Rules/Crew Procedures Yes ALERTS, GIDEP’s, TWX’s YesYes* ADP’s, TPS’s YesYes* H/W &S/W Noncomformances YesYes* Open FIAR’s YesYes* SPN’s YesYes* *Indirect Involvement via SSP and ISS S&MA Organizations

8 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan PIH Experiment

9 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan Cost Risk R ELIABILITY and R ISK M ANAGEMENT for Experiment

10 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan R ELIABILITY and R ISK M ANAGEMENT for Experiment Observation; Attend Meetings Selective Surveillance CryogenicsEMI & Magnetic Systems Thermal Systems Pressure Systems StructuresEEE Parts Full On-Site Quality System for Each Collaborator On-Demand Independent Assessment WeldingNon Destructive Evaluation (NDE)

11 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan Observation; Attend Meetings Selective Surveillance Space Cryomagnetics LTD, UK Arde, Inc., USA CAEN Aerospace, Italy Full On-Site Quality System for Each Collaborator On-Demand Independent Assessment Carlo Gavazzi Space SpA, Italy ISATECH Engineering GmbH, Germany OHB GmbH, Germany R ELIABILITY and R ISK M ANAGEMENT for Experiment *Note: Sample list of manufacturers

12 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan R ELIABILITY and R ISK M ANAGEMENT for Experiment

13 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan

14 Safety & Mission Assurance Plan July 15, 2004 AMS-02 Rebaselining Outbrief David Kaplan RiskCost Observation; Attend Meetings Selective Surveillance Full On-Site Quality System for Each Collaborator On-Demand Independent Assessment Cost Risk R ELIABILITY and R ISK M ANAGEMENT for Experiment Recommendation: Selective Independent Assessment & Surveillance