Presentation is loading. Please wait.

Presentation is loading. Please wait.

September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.

Similar presentations


Presentation on theme: "September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008."— Presentation transcript:

1 September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008

2 F. Richard LAL/Orsay2 Outline  The ECFA meeting on LC detectors (Warsaw June 9-12)  The kickoff meeting of ILC Hi- grade (DESY August 29)  Workshops and deliverables  Conclusions

3 September 2008F. Richard LAL/Orsay3  ECFA LC meeting on Detectors with 200 poarticipants  Talk given by R. Heuer:  ‘Expect period for decision taking on next steps in 2010 to 2012’  ‘Need R&D and technical design work now to enable decisions’  ‘Need global collaboration and stability on a long time scale’  First review of LoI called by ILCSC (IDAG chaired by M. Davier)  Participation of CLIC representatives (talk by A. De Roeck)

4 September 2008F. Richard LAL/Orsay4 ILC Roadmap  Recent statement of FALC Regarding the ILC, they state, "The availability of first results from the LHC are expected to show if the ILC is the correct route for a future linear collider or whether a higher energy reach, as could be obtained with CLIC, is required. The need to reach international agreements on siting and construction, and the current availability of R&D funds all suggest the potential of a construction decision for the ILC near the middle of the next decade."  This matches well with the new Roadmap aiming at 2012

5 September 2008F. Richard LAL/Orsay5 ILC Hi-grade Kick-off meeting  See: http://ilcagenda.linearcollider.org/conferenceOtherViews.py?view=standard&confId=2900  CERN, DESY, IdF, INFN, Oxford  5 M€ from EU  Governance, siting, coordination, outreach aspects for ILC  Within XFEL ordering by end of 2010 ~30 cavities with couplers, tuners used to establish the operating gradient for ILC  2 participants from ELAN management L. Lutz and FR

6 September 2008F. Richard LAL/Orsay6 ELAN supported Workshops

7 September 2008F. Richard LAL/Orsay7 ELAN Notes  CARE/ELAN document-2008-001 CLIC-Lecture given at the 2nd International School for Linear Colliders CLIC-Lecture given at the 2nd International School for Linear Colliders F. Tecker, CERN, Geneva, Switzerland F. Tecker, CERN, Geneva, Switzerland  CARE/ELAN document-2008-002 Exploring ultra-low values β* in ATF2- R&D Programme proposal Exploring ultra-low values β* in ATF2- R&D Programme proposal D. Angal-Kalimin, Cockcroft Institute, Daresbury, UK, S. Bai, CNRS-IN2P3-LAL, Orsay, France and IHEP, Beijing, China, P. Bambade, CNRS-IN2P3-LAL, Orsay, France, H. Braun, CERN, Geneva, Switzerland, J.P. Delahaye, CERN, Geneva, Switzerland, J. Gao, IHEP, Beijing, China, Y.Honda, KEK, Tsukuba, Japan, J. Jones, Cockcroft Institute, Daresbury, UK, S. Kuroda, KEK, Tsukuba, Japan, T. Okugi, KEK, Tsukuba, Japan, Y. Renier, CNRS-IN2P3-LAL, Orsay, France, A. Scarfe, Cockcroft Institute, Daresbury, UK, D. Schulte, CERN, Geneva, Switzerland, A. Seryi, SLAC, Stanford, USA, T. Tauchi, KEK, Tsukuba, Japan, R. Tomas, CERN, Geneva, Switzerland, J. Urakawa, KEK, Tsukuba, Japan, D. Wang, IHEP, Beijing, China, M. White, CNRS-IN2P3-LAL, Orsay, France and SLAC, Stanford, USA, M. Woodley, SLAC, Stanford, USA, X.W. Zhu, IHEP, Beijing, China, F. Zimmermann, CERN, Geneva, Switzerland, D. Angal-Kalimin, Cockcroft Institute, Daresbury, UK, S. Bai, CNRS-IN2P3-LAL, Orsay, France and IHEP, Beijing, China, P. Bambade, CNRS-IN2P3-LAL, Orsay, France, H. Braun, CERN, Geneva, Switzerland, J.P. Delahaye, CERN, Geneva, Switzerland, J. Gao, IHEP, Beijing, China, Y.Honda, KEK, Tsukuba, Japan, J. Jones, Cockcroft Institute, Daresbury, UK, S. Kuroda, KEK, Tsukuba, Japan, T. Okugi, KEK, Tsukuba, Japan, Y. Renier, CNRS-IN2P3-LAL, Orsay, France, A. Scarfe, Cockcroft Institute, Daresbury, UK, D. Schulte, CERN, Geneva, Switzerland, A. Seryi, SLAC, Stanford, USA, T. Tauchi, KEK, Tsukuba, Japan, R. Tomas, CERN, Geneva, Switzerland, J. Urakawa, KEK, Tsukuba, Japan, D. Wang, IHEP, Beijing, China, M. White, CNRS-IN2P3-LAL, Orsay, France and SLAC, Stanford, USA, M. Woodley, SLAC, Stanford, USA, X.W. Zhu, IHEP, Beijing, China, F. Zimmermann, CERN, Geneva, Switzerland,  CARE/ELAN document-2008-003 Optical configurations with variable β* at different IP locations in ATF2 Optical configurations with variable β* at different IP locations in ATF2 S. Bai,CNRS-IN2P3-LAL, Orsay, France and IHEP, Beijing, China, P. Bambade, CNRS-IN2P3- LAL, Orsay, France S. Bai,CNRS-IN2P3-LAL, Orsay, France and IHEP, Beijing, China, P. Bambade, CNRS-IN2P3- LAL, Orsay, France  CARE/ELAN document-2008-004 ILC in 2008 ILC in 2008 F. Richard,LAL, IN2P3-CNRS, Orsay, France F. Richard,LAL, IN2P3-CNRS, Orsay, France

8 September 2008F. Richard LAL/Orsay8 Plans & Deliverable(s)  In 2008, as we said at the CARE SC, our program is at a minimum (support to workshops)  2008: Final Report of the Network  Will not be easy to fulfill since most conveners are heavily committed

9 September 2008F. Richard LAL/Orsay9 Conclusions  Exciting period…  No ELAN specific activities but we help on various aspects on various aspects  ELAN resources are usefully spent in travel money  Unclear on how to write the final report

10 September 2008F. Richard LAL/Orsay10 ELAN steering committee F. Richard (Coordinator) D. Schulte (Deputy) G. Guignard (WP LTECNC) L. Lilje (WP LTECSC) D. Schulte (WP BDYN) G. Blair (WP BDYN) B. Cros (WP ANAD)


Download ppt "September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008."

Similar presentations


Ads by Google