Cooperative Continuity Management Bill Willingham Florida Electric Cooperatives Association, Inc. Tallahassee, FL
3
Mitigation/Hardening There are several things that co-ops can do to “harden” the system, but they are not cheap or without complications Research projects Preventative Maintenance Standards and materials
4
Mitigation/Hardening (cont.) Research projects PURC RUS CRN
5
Overhead Pole Inspections Our members meet the RUS standard New pole attachment agreements Construction Standards and Materials Using stronger poles and modified standards on new construction and rebuilds Vegetation Management Best bang for the $$ for most co-ops
6
Vegetation Management
7
Design/Construction Standards Overhead facilities can be built to withstand higher winds if money is not an issue, but even the strongest designs cannot withstand all of the trees, debris, tornados, or microbursts
10
Underground Problems –flexibility in rural areas –cost –longer non-disaster outages –coastal areas –flood prone areas –trees
11
Restoration Each co-op has its own restoration plan, and these plans continue to evolve as we learn from our own experiences and from helping others. FECA has a comprehensive plan for coordinating mutual aid and otherwise assisting its members
12
Approximately 900 coops and 2,000 municipally- owned electric utilities
13
Restoration (cont.) The utilities and the EOC have worked very well together.