Download presentation
Presentation is loading. Please wait.
Published byBennett Henry Modified over 8 years ago
1
DSWG - June 25, 2014 2013 Four-CP Response for Transmission- and Distribution- Connected ESIIDs in ERCOT Competitive Area Carl L Raish
2
2 4 CP Response Methodology Analysis was limited to ESIIDs in competitive ERCOT areas with ‘BUSIDRRQ’ profile types Transmission charges are based on ESIID-specific load during CP intervals ESIIDs classified by connection at transmission or distribution voltage level Classified days as CP Days, Near-CP Days and Non-CP Days Near-CP days were iteratively determined Started with 12 possible days Removed days from list if no response detected for the date Ended up with 7 Near-CP days Non-CP days were all remaining non-holiday weekdays (June 1 – Sep 30) Classified ESIIDs based on Weather Sensitivity and Load Factor Weather sensitivity (R 2 for week-day use vs average temperature >= 0.6) Load Factor based on week-day afternoon usage (1:00 PM – 6:00 PM) High LF > 0.85 Medium LF > 0.60 Low LF ≤ 0.60
3
3 4 CP Response Methodology (continued) ESIIDs were classified into three response categories based on how they modified usage on CP and Near-CP days Reduced Day Use -- ESIIDs that lowered usage from 9:00 AM – 5:00 PM) on CP/Near-CP days. Reduced CP Hour Use -- ESIID that lowered usage during 4:00 PM – 5:00 PM on CP/Near-CP days (but did not reduce day use). Did not respond – All remaining ESIIDS
4
4 4 CP Response Methodology (continued) Response Type Load Factor Category HighMediumLowTotal Reduce Day Use 22202668 Reduce Peak Hour Use 35281881 Non-Respond1044818170 Total1619662319 Number of Transmission ESIIDs by Response Type
5
5 4 CP Response Methodology (continued) Response Type Load Factor Category HighMediumLowWS * Total Reduce Day Use 313768861,293 Reduce Peak Hour Use 2066435781,427 Non-Respond2,4563,0468311,6617,994 Total2,6934,0652,2951,66110,714 Number of Distribution ESIIDs by Response Type * WS response and type needs additional analysis
6
6 4 CP Response Methodology (continued) Baselines were created at the ESIID-level using Non-CP days (May 1 – Sep 30). Average of 10 days before and 10 days after the CP/Near-CP day. Baselines were aggregated in groups by response type and load factor category WS baseline was ERS Regression baseline Scalar day-of-adjustment applied at the aggregated group level. Day-of-adjustment window: 0:15 AM – 1:00 PM Baseline energy for the adjustment window was scaled to the actual energy for the CP/Near-CP day No scalar adjustment was applied to the group with ‘day-use’ response Adjusted and unadjusted baselines are shown on graphs for non-responding ESIIDs In general these ESIIDs had actual use higher than the baseline on CP/Near-CP days than the unadjusted baseline If these ESIIDs are included in the overall class performance, their increased usage would offset reductions by the remaining ESIIDs
7
7 4 CP Response Methodology (continued) September 3, 2013 CP day special handling Load shapes were different … probably related to being the day following the Labor Day holiday. Tables and graphs show reductions for baselines with and without day-of- adjustment Reductions based on scalar adjusted baselines reflect the actual load reduction on that day Reductions based on unadjusted baselines are probably closer to reductions on more normal CP days.
8
8 15-Minute Reductions on 4 CP Days - 2013 Transmission Connected ESIIDs
9
9 15-Minute Reductions on 4 CP Days - 2013 Distribution Connected ESIIDs
10
10 15-Minute Reductions on 4 CP Days - 2013 Transmission plus Distribution Connected ESIIDs Largest Combined Summer 2013 reduction occurred on August 7
11
11 Identify Near-CP Days – June 2013 4CP @ IE 17:00 Near-CP w/ response
12
12 Identify Near-CP Days – July 2013 4CP @ IE 17:00 Near-CP w/ response Near-CP no response
13
13 Identify Near-CP Days – August 2013 4CP @ IE 17:00 Near-CP w/ response Near-CP no response
14
14 Identify Near-CP Days – September 2013 4CP @ IE 16:45 Near-CP no response Note: Sep 1, 2013 Sunday, Sep 2 Labor Day
15
15 15-Minute Reductions on Near Peak Days - 2013 Largest Summer 2013 reduction occurred on August 1 Transmission Connected ESIIDs
16
16 15-Minute Reductions on Near Peak Days - 2013 Largest Summer 2013 reduction occurred on June 28 Distribution Connected ESIIDs
17
17 15-Minute Reductions on Near CP Days - 2013 Transmission plus Distribution Connected ESIIDs
18
18 Hour-ending 17:00 Reductions on 4 CP Days - 2013 Transmission Connected ESIIDs
19
19 Hour-ending 17:00 Reductions on 4 CP Days - 2013 Distribution Connected ESIIDs
20
20 Hour-ending 17:00 Reductions on 4 CP Days - 2013 Transmission plus Distribution Connected ESIIDs Largest Combined Summer 2013 reduction occurred on August 7
21
21 Hour-ending 17:00 Reductions on Near Peak Days - 2013 Transmission Connected ESIIDs
22
22 Hour-ending 17:00 Reductions on Near Peak Days - 2013 Distribution Connected ESIIDs
23
23 Hour-ending 17:00 Reductions on Near CP Days - 2013 Transmission plus Distribution Connected ESIIDs
24
24 Reduction Percent by Load Factor - Transmission
25
25 Reduction Percent by Load Factor - Distribution
26
26 Percent Reduction by Load Factor - Transmission
27
27 Percent Reduction by Load Factor - Distribution
28
28 June CP Day Load – Responding ESIIDs - 2013 Transmission Connected ESIIDs
29
29 June CP Day Load – Responding ESIIDs - 2013 Distribution Connected ESIIDs
30
30 June CP Day Load – Responding ESIIDs - 2013 Transmission Plus Distribution Connected ESIIDs
31
31 July CP Day Load – Responding ESIIDs - 2013 Transmission Connected ESIIDs
32
32 July CP Day Load – Responding ESIIDs - 2013 Distribution Connected ESIIDs
33
33 July CP Day Load – Responding ESIIDs - 2013 Transmission Plus Distribution Connected ESIIDs
34
34 August CP Day Load – Responding ESIIDs - 2013 Transmission Connected ESIIDs
35
35 August CP Day Load – Responding ESIIDs - 2013 Distribution Connected ESIIDs
36
36 August CP Day Load – Responding ESIIDs - 2013 Transmission Plus Distribution Connected ESIIDs
37
37 September CP Day Load – Responding ESIIDs - 2013 Transmission Connected ESIIDs
38
38 September CP Day Load – Responding ESIIDs - 2013 Distribution Connected ESIIDs
39
39 September CP Day Load – Responding ESIIDs - 2013 Transmission Plus Distribution Connected ESIIDs
40
40 June CP Day Load by Reduction Type - 2013 Transmission Connected ESIIDs
41
41 June CP Day Load by Reduction Type - 2013 Distribution Connected ESIIDs
42
42 July CP Day Load by Reduction Type - 2013 Transmission Connected ESIIDs
43
43 July CP Day Load by Reduction Type - 2013 Distribution Connected ESIIDs
44
44 August CP Day Load by Reduction Type - 2013 Transmission Connected ESIIDs
45
45 August CP Day Load by Reduction Type - 2013 Distribution Connected ESIIDs
46
46 September CP Day Load by Reduction Type - 2013 Transmission Connected ESIIDs
47
47 September CP Day Load by Reduction Type - 2013
48
48 ON OFF Questions? craish@ercot.comcraish@ercot.com512/248-3876
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.