Download presentation
Presentation is loading. Please wait.
Published byPeter Washington Modified over 8 years ago
1
WINS Monthly Meeting www2.widener.edu/wins http://www.widener.edu/whatsup/ http://events.internet2.edu/index.cfm 12/01/2006 www2.widener.edu/wins http://www.widener.edu/whatsup/ http://events.internet2.edu/index.cfm
2
Agenda Introductions IE 7.0 Issues Current Bandwidth Demands Allot NetEnforcer Tips Learned WINS Blog Question & Answers
3
Introductions Name Title Location WELCOME!! Marple Newtown : Joe Violanti, Director of Technology
4
IE 7.0 Issues IE 7.0 Critical Windows Update Many applications with problems Poll for issues?
5
Current Bandwidth Demands
6
Current Bandwidth Demands (cont) The Issue:
7
Allot NetEnforcer Traffic Shaping QOS – Priority, Min, Max Pipes Virtual Channels Fallback GUI and CLI Interface Monitor, Classify, Apply Action
8
Allot NetEnforcer (cont) Changes to attempt to resolve issue: 1. Dorm students limited to 1 Mb 2. Critical Applications Pipe Created 3. Peer to Peer blocked with more enforcement 4. Max Bandwidth controls : –Dorms 33 Mb –Tech Park 2 Mb –Widener 18 Mb –WINS 60 Mb (Per District 15 Mb) Last resort will be to increase Yipes to 90 Mb…..
9
Tips Learned Java – Issues when multiple versions are needed –Solution: Uninstall all versions, then install newest version, then install most recent to that, then most recent to that… Top Down. Auto Negotiation Mismatch – Auto/Auto, FULL/FULL Auto to FULL Duplex always results in Half Duplex!
10
WINS Blog As requested by Randy McNally Presented by Tom Erbe https://beta.blogger.com/login.g?d=http%3A%2F%2Fbeta.blogger.com%2Fhome&passive=true
11
Questions & Answers Merry Christmas and a Happy New Year!!!! Next Meeting Jan 5 th, 2007!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.