Presentation is loading. Please wait.

Presentation is loading. Please wait.

Miles City Levee EAP. Project Goals Project Purpose Life Safety WRDA Floodplain – 79% in floodplain – 5% within floodway – Community Rating System.

Similar presentations


Presentation on theme: "Miles City Levee EAP. Project Goals Project Purpose Life Safety WRDA Floodplain – 79% in floodplain – 5% within floodway – Community Rating System."— Presentation transcript:

1 Miles City Levee EAP

2 Project Goals

3 Project Purpose Life Safety WRDA Floodplain – 79% in floodplain – 5% within floodway – Community Rating System

4 Miles City Failure Scenarios Spring Runoff Dam Failure – Tongue River Ice James Levee Degradation

5 Typical Spring w/Ice Jam

6

7 Breach Model

8

9

10 Plan Layout - Prevention Prevention – Interior Drainage – Actions for Sanitary, Storm, and Surface Drainage

11 Plan Layout - Response Response – Contact Information – Roles and Responsibilities – Resources


Download ppt "Miles City Levee EAP. Project Goals Project Purpose Life Safety WRDA Floodplain – 79% in floodplain – 5% within floodway – Community Rating System."

Similar presentations


Ads by Google