Download presentation
Presentation is loading. Please wait.
Published byJonathan Barrett Modified over 9 years ago
1
© Nokia Siemens Networks User Interface of a GSM Capacity Analysis Tool Thesis work presentation 13.11.2007 Author: Rami Ertimo Supervisor: Patric Östergård Instructor: Nilmini Lokuge
2
Agenda Introduction to the Study – Problem Setting, Objectives, Research Methods Capacity Analysis User Requirements User Interface Conclusions
3
Fractured data spread across operators’ OSS related to EGPRS Capacity Analysis Different bodies of the organisation involved in fixing different domains of the EGPRS network No view of the overall situation in the network These causing inadequate network performance and loss of revenue. Problem setting
4
Objectives Gather and categorise user requirements Analyse user requirement to build a conclusive workflow to support the needed functions in Capacity Analysis From the user requirements and workflow build a easy to use User Interface that seamlessly supports the workflow and also individual user requirements
5
Research Methods Literature study – Specification related to GSM, GPRS and EDGE (ITU, 3GPP) – Books related to usability, user-centered design, network optimisation, capacity analysis, EGPRS networks – Publications and web pages related to user interface creation and user- centered design. Practical part – Gathering User Requirements (interviews, workshops) – Analysing User Requirements Creating User Stories – Iterating over: ▪ Prototyping ▪ Collecting feedback ▪ Revisiting design and prototype ▪ Ensuring end product design
6
Agenda Introduction to the Study – Problem Setting, Objectives, Research Methods Capacity Analysis User Requirements User Interface Conclusions
7
GGSN Applicatio n Servers BSC 2G SGSN Application Servers in Internet Four Analysis Domains: Radio interface capacity analysis Abis interface EDAP pool size capacity analysis BSC/PCU capacity analysis Gb capacity analysis GPRS/EDGE capacity analysis BSS Radio Abis/EDAP PCU Gb
8
Reliability in trouble shooting Performance decrease is usually seen in BTS KPIs even though the actual problem is elsewhere. Tool should help in identifying the correct root cause of the problem Accuracy for dimensioning When adding capacity see and understand the bottleneck domain and required size Over dimensioning can be avoided and desired capacity can be ensured in whole chain Speed and easiness of all steps Offer one view to see all the elements and interfaces Highlight the capacity bottle necks and guide the user to over come the problem Help to identifying the changes in one place cause any bottlenecks elsewhere Edge-2-Edge view for Capacity Analysis
9
Agenda Introduction to the Study – Problem Setting, Objectives, Research Methods Capacity Analysis User Requirements User Interface Conclusions
10
User Requirements User Stories – High-level definition of a requirement – Short description of a piece of functionality told from the user perspective – Focus on the user – Leaves enough room for design – Can typically be easily mapped to User Interface functionality – Problems with text formed requirements They do not visualise the desired solutions in clear manner Example: – “As a Network Planning Expert, I can modify the GPRS territory”
11
Workflow
12
Agenda Introduction to the Study – Problem Setting, Objectives, Research Methods Capacity Analysis User Requirements User Interface Conclusions
13
User Interface Demo about: 1. CM and PM Import 2. Visualisation features related to: Navigator Custom Labels, Capacity View Browser Profiles, CM and PM parameters Map Sites, Cell Icon, Cell Area, Parameters related to map 3. Preferences 4. Capacity Analysis E-2-E Analysis Different Domains
14
Import and Preferences
15
Overall User Interface
16
Agenda Introduction to the Study – Problem Setting, Objectives, Research Methods Capacity Analysis User Requirements User Interface Conclusions
17
User Stories in addition with well defined workflow help in identifying missing features and gaps in the UI workflow Truly user friendly and usable interface requires iteration over iteration over iteration Centralised solution to analyse the whole BSS domain helps in the analysis capacity bottleneck and reduces operator OPEX and CAPEX. Only the first step towards the right direction: – More automation needed – Need to be proactive rather than reactive – The radio domain is not sufficient for an End-2-End solution – EGRPS network are being complemented with UMTS networks – Many operators have multiple vendors
18
© Nokia Siemens Networks Thank you Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.