Download presentation
Presentation is loading. Please wait.
Published byAnis Simon Modified over 8 years ago
1
CERNAVODA NPP ENVIRONMENTAL LABORATORY BUCUR CRISTINA CERNAVODA NPP-ROMANIA
2
INTRODUCTION CERNAVODA NUCLEAR POWER PLANT IS DEDICATED TO PRODUCE ELECTRICAL & THERMAL POWER IN A SAFE AND EFFICIENT MANNER FOR AT LEAST 30 YEARS, FROM NUCLEAR POWER USING CANDU TECHNOLOGY
3
ENVIRONMENT MANAGEMENT SYSTEM AT CERNAVODA NPP factors which ensure that the public health and environment are adequately protected: source control effluent control effluent monitoring environmental monitoring
4
ENVIRONMENTAL ROUTINE RADIATION MONITORING PROGRAM designed to meet the following objectives under normal NPP operating conditions: to measure the radionuclide concentrations in environmental media; to provide an independent assessment of the effectiveness of the source control, effluent control and monitoring based on measurements in environment;
5
ENVIRONMENTAL ROUTINE RADIATION MONITORING PROGRAM (cont’d) to validate the models and parameters used in the calculation of the derived emission limits; to provide data to aid in the development and evaluation of models and methodologies that adequately describe the movement of the radionuclides through the environment.
6
ENVIRONMENTAL MONITORING PROGRAM (cont’d)
13
All radionuclide analyses (10704 measurements on 6597 samples 1996 - 2004) were carried out in the Environmental Control Laboratory located at 2 km from first reactor of Cernavoda NPP.
14
ENVIRONMENTAL CONTROL LABORATORY
15
ENVIRONMENTAL CONTROL LABORATORY (cont’d)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.