8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.

Similar presentations


Presentation on theme: "8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts."— Presentation transcript:

1 8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts from CV 2)Cooling and air compressed Status: Sylvain Girod is going to meet today experts from CV Today I’m going to meet experts from CV 3)Access system; key lock missing in the turnstile. Two possibility to operate the source are under evaluation: a.Only FREE and CLOSED more (i.e. patrol needed after every access [as it was al old GIF]) b.Install key lock (depending on availability of material) Status: EN/Adrian Fabich. Not solved. For the moment impossible to operate irradiator Key installed? To be check

2 8/4/2015R. Guida PH-DT-DI2 Info New: 4)Access/Safety system (EN); missing lamp to indicate status of irradiator from outside bunker. Roberto proposed two possibilities: a.RP has portable radiator sensor with lamp  very old device and not clear electrical scheme for connection (Nicolas will check if something can be done) b.VF is coming next week (not available this week) to install the lamp  Federico is following.

3 8/4/2015R. Guida PH-DT-DI3 Info 5)HSE memorandum for safety clearance (EN & HSE): missing electrical inspection. Roberto is following. Should be Organized by end of this week beginning of next according to availability of experts. 6)Other minor issues for HSE memorandum for safety clearance (EN & HSE): missing fire extinguishers “and two other minor things”. Adrian Fabich is following 7)Flammable gas safety inspection: done. We are missing the electrical inspection and declaration of ATEX zones by PH-FGSO. Roberto is following. 8)Mixers for cosmic & beam triggers: we expect control rack to be installed by the end of this week. Cabling this week. Commissioning and operation by beginning next week. Roberto is following.

4 8/4/2015R. Guida PH-DT-DI4 Schedule for next weeks 1)8-10 April: Electrical inspection and HSE memorandum released 2)RP old radiation monitor lantern working (?) 3)10 April: we hope to be able to close the zone and false floor. In this case, Radiation will start. 4)13-15 April: We hope to have VF working on fixing the “radiation on” lamp. Zone will stay open with the exception of 0.5 day needed to test the lamp (plus some interlocks); 5)16 April: stop radiation to prepare “VIP” visit. EN/Adrian Fabich in charge. 6)17 April: “VIP” visit 7)17 April: restart radiation after visit.