NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.

Similar presentations


Presentation on theme: "NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo."— Presentation transcript:

1 NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew U Ioffe Inst RRC Kurchatov Inst TRINITI NFRI KAIST POSTECH Seoul National U ASIPP ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Washington U Wisconsin NSTX-U Supported by

2 NSTX NSTX Team Meeting –Masa Ono August 15, 2014 Time: 2:30 ~ 4:00, December 4 (Thursday), 2014 Place: LSB 318, PPPL General Items (15 minutes) Program Items (15 minutes) Data management policy (15 minutes) Upgrade Project (15 minutes) Engineering Operations (15 minutes) Research Operations (15 minutes) NSTX-U Team Meeting Agenda 2

3 NSTX NSTX Team Meeting –Masa Ono August 15, 2014 ES&H Issues (J. Levine) ESHD 5008 (PPPL Safety Manual) Section 11 Chapter 1 requires the NSTX-U Project to prepare a Safety Assessment Document (SAD) and to obtain a Safety Certificate authorizing operations. The SAD must include identification of hazards associated with operations and methods employed for their mitigation. SADs are reviewed and approved by the PPPL Safety Review Committee and the NSTX-U Activity Certification Committee (ACC-appointed by ES&H Executive Board). The Safety Certificate constitutes PPPL approval to conduct operation of NSTX-U within the conditions and/or constraints indicated therein (e.g., limits on annual neutron production, limits on lithium inventory in the NTC, limits on dTMB – deuterized trimethylborane inventory in the NTC, etc.). It is Issued by the PPPL ES&H Executive Board based on ACC recommendations, and will be posted in the Control Room. If future proposed changes to NSTX-U could impact the SAD hazard analysis and/or the Safety Certificate, the ACC will be asked to review these changes and recommend to the ES&H Executive Board whether to modify the NSTX-U Safety Certificate to authorize operations with the proposed changes. Safely, Safely, Safely 3

4 NSTX NSTX Team Meeting –Masa Ono August 15, 2014 A recent serious injury Office Safety Group Meeting - In keeping with PPPL's goal to provide a safe work environment, we have scheduled group meetings on office safety at PPPL. The hazards of office work are significant and many people suffer serious injuries in their offices every year. The PPPL safety staff will cover a broad range of office safety topics including - how we can protect ourselves from being hurt. You are required to attend one of the two sessions that have been scheduled: Friday - December 5, 2014 - 2pm - LSB Auditorium Thursday - December 18, 2014 - 2pm - LSB Auditorium Thank you for your help in keeping PPPL a safe workplace. MikeZarnstorff NSTX-U operational preparation activity (e.g., diagnostic installation) is commencing and we need to be extra cautious regarding safety! Winter weather is here! - Proper protective clothing / equipment for outdoor work, keep warm - Slippery road and walk-way conditions – W e a r r u b b e r s o l e s h o e s a n d b e m i n d f u l o f s u r f a c e s c o n d i t i o n s - Proper exercise – warm up z Safely, Safely, Safely 4 Wish you happy holidays!

5 NSTX NSTX Team Meeting –Masa Ono August 15, 2014 Commissioning I p <=1.0 MA, B T <=0.5 Breakdown and current ramp scenarios EFIT & rtEFIT Reconstructions Shape & position control Reliable H-mode Diagnostic operations DCPS under plasma operations Boronizaton +He GDC for PFCs Short Vent to Install New Diagnostics (no manned entry!) only if needed. Data Acquisition & Diagnostics Commissioning Ex-Vessel Diagnostic Installations Gas Delivery System Final Checks Magnetics Debugging Beamline #1 Final Checks Calibrations: Magnetic MSE CHERS Neutrons Boronization / GDC Activities between CD4 and Research Run Important to optimize them to start the timely research run! We will try to move the short vent before CD-4. We will also perform MPTS Rayleigh Raman before CD-4 if possible. We will try to minimize the commisioning time to move on to the research run as quickly as possible. 5

6 NSTX NSTX Team Meeting –Masa Ono August 15, 2014 Aquapour + CS casing installation issues caused a CD-4 delay of ~ 3-4 weeks ~ 2 month period allocated between CD-4 and research plasma operations  CD-4 in mid-March, research ops in mid-May Plan: ~12-14 run weeks (assumes 1 maintenance week / month) If machine is running well at end of FY15, may run into early FY16 Provide additional data for APS 2015 and IAEA synopses for 2016 Research Plasma Operation 14 Run Weeks Nov. 2014Dec. 2014Jan. 2015Feb. 2015Mar. 2015Apr. 2015May 2015Jun. 2015Sep. 2015Jul. 2015Aug 2015 Bakeout ISTP / Comm CD4 Nominal NSTX-U run schedule for FY2015 6

7 NSTX NSTX Team Meeting –Masa Ono August 15, 2014 Heating Systems T. Stevenson Device Operation A. von Halle Central I&C P. Sichta Power Systems J. Lacenere Auxiliary Systems W. Blanchard Experimental Research Ops Stefan Gerhardt Deputy: Robert Kaita RF Systems J. Hosea Physics Operations D. Mueller Diagnostic Ops & R&D B. Stratton Boundary Physics Operations R. Kaita Engineering Ops Al von Halle Project Engineer Peter Titus Run Coordination Jon Menard Stefan Gerhardt (deputy) NSTX-U Organization – FY2015 Theory & Simulation A. Bhattacharjee Physics Analysis Stan Kaye Publications & Presentations Computational Support B. Davis Integrated Scenarios S. Gerhardt Diagnostic Design/Fab R. Ellis Boundary Science R. Maingi Core Science S. Kaye Construction E. Perry Science Groups Project Director Masayuki Ono Program Director Jon Menard Deputy: Stan Kaye NSTX Upgrade Department Particle Control Task Force (FY2015-16) R. Maingi NSTX-U Organization Chart 7