1 MIPI European Transparency Project (ETP) 10 th September 2010

2 2 MIPI European Transparency Project (ETP) 29 - 30Additional ASEP’s 26 - 28, 30Enhanced reports 22 - 25New reports 19 - 21Summary of report changes 17 - 18Report Explorer 16Unit Conversions 15Prevailing View 14 - 47Changes to MIPI: 7 -13Data Supplied to ENTSOG 6Timeframe 5Summary (MIPI ETP) 3 - 4Introduction and background PageTopic 50Further information (Queries) 49Further information (EU 3 rd package) 48Summary - what we have covered 40 - 47New and revised graphs 39Graphical package 38Updated information on how Gas is Delivered – including revised map to include interconnectors 37Units of Measure 36Data Storage and Data Dictionary 35Data Item Explorer 31 - 34Reports changing location PageTopic Contents

3 3 MIPI European Transparency Project (ETP) Introduction The EU Council agreed the 3rd package of EU energy market legal obligations (ref 715/2009) on 3rd September 2009. These obligations are passed to the UK government and detail the requirements on EU gas transporters for the transparency and publication of specified data. Transparency projects are aimed at delivering improved and consistent publication of transmission data amongst EU members in order to facilitate the requirements of market participants, and to act as a step towards a regional (and ultimately a single European) energy market. The EU 3rd package grants an 18 month implementation window for EU member states. The compliance deadline is 3rd March 2011 to which National Grid must adhere, however, we will implement early on 15th November 2010. This legislation aims to facilitate an EU-wide gas market by provision of a common dataset.

4 4 MIPI European Transparency Project (ETP) Background - Market Information Provision Initiative (MIPI) In 2007 was the first phase of MIPI Its remit was to move the delivery of the key obligated and Incentivised Market Information (behind approximately 50% of the reports in the legacy IE3 system) to a new application sited on the strategic, high availability Gas Market Reporting System (“GMRS”) infrastructure. In 2008/09 was the 2nd and final phase of MIPI Further Market Information was transferred onto GMRS, including all of the remaining information that was still published by IE3 after the completion of the MIPI Phase 1 project and which would continue to be required. Additionally, MIPI Phase 2 made provision for the continued publication of obligated shipper specific data which had been sourced from IE3, thus allowing IE3 to be decommissioned. Note: As part of MIPI Phase 2 a link was provided from the IE3 page to allow those people who had this listed as a “favourite” link easy access to MIPI (so the link did not disappear after IE3 was decommissioned). This will be disabled as part of the European Transparency project.

5 5 MIPI European Transparency Project (ETP) Summary of changes (MIPI ETP) ENTSOG Publish obligated data to the ENTSOG (GTE) platform (automated service). Link to ENTSOG: www.gas-roads.euwww.gas-roads.eu MIPI The MIPI ETP project will build on the current strategic MIPI platform for data consistency and transparency across TSO’s:- Link to MIPI: www.nationalgrid.com/uk/Gas/Data  Standardisation of Units of Measure.  Additional data to be published (both increased volume & frequency).  Upgrade of graphics package - provision of new graphs and enhancement to existing graphs.  Extend the online retrieval availability of MIPI data to a rolling five years of history (data to be available with effect from 01/10/2010 and to be built up over time).

6 6 MIPI European Transparency Project (ETP) JunMay 03/03/2011 SepAugJul Design Testing 03/03/2011 OctNov Development Implementation Governance EU 3 rd Package Implementation Deadline Timeframe Governance Activity Date Data Dictionary updated to reflect the MIPI changes 1st September 2010 Submit updated Reporting Manual to UNCC 2nd September 2010 UK Link Committee* 9th September 2010 UNCC Meeting 16th September 2010 MIPI ETP Go-Live 15th November 2010

7 ENTSOG Section

8 8 Data to be supplied to the ENTSOG platform DataFrequency NominationsDaily (D-1) Re-nominations (including final nominations) Publishing Hourly Data (within day) Allocations Monthly (M+7 for Exit and M+16 for Entry). Scaleback of interruptible capacity Adhoc (D+1) - Information will be displayed when interruption occurs, for example, no data will be issued unless interruption of capacity (scaleback) occurs. Capacity and Tariff dataMonthly and Adhoc Note 1: Capacity and Tariff data is currently provided by a manual process. This data will become part of an automated service. Note 2: Normal Units of Measure (UOM) will be issued to ENTSOG. Unit conversion information is provided on slide 16. MIPI European Transparency Project (ETP)

9 9 The following data items will be submitted to ENTSOG:- Nominations 1 daily value for the ASEP's (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). This value is the initial aggregated nomination value (aggregated input nominations & output nominations across all shippers at each ASEP (Entry) and Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). This will be issued to ENTSOG once it is available. Re-nominations/final nominations Hourly value for the ASEP's (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). This value is the final end-of-day aggregated nomination (which could be a re-nomination) value. Aggregated input nominations or re-nominations & output nominations or re-nominations across all shippers at each ASEP (Entry) and Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). This will be issued to ENTSOG once it is available, before the end of D+1. Data to be supplied to the ENTSOG platform - further detail (for new items)

10 10 MIPI European Transparency Project (ETP) The following data items will be submitted to ENTSOG:- Allocations Values for ASEP's (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). The initial allocation value for each ASEP and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL) will be issued to ENTSOG once it is available. This is the original ‘provisional’ value for each ASEP (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). The ‘confirmed’ allocation value for each ASEP (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL) will be issued to ENTSOG once it is available (M+7 for Exit and M+16 for Entry). Values are the aggregated allocation values (aggregated input allocations & output allocations across all shippers at each ASEP and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). Data to be supplied to the ENTSOG platform - further detail (for new items)

11 11 MIPI European Transparency Project (ETP) Data to be supplied to the ENTSOG platform - further detail (for new items) The following data items will be submitted to ENTSOG:- Scaleback of interruptible capacity An indicator showing whether any scaleback of interruptible capacity has occurred on the day. Interruption in this instance refers to capacity shortfall resulting in scaleback. Scaleback (Interruption) Detail One set of information for each instance of interruption at the ASEP's (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). For each instance of interruption the date and scaled back (interruption) amount at the appropriate ASEP (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL ) in kWh/day will be provided. For each day of scaleback interruption the total booked interruptible capacity at the appropriate ASEP (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL) and the scaled back amount as a percentage of the whole booked Interruptible amount at the ASEP (Entry) and the Interconnector (Exit) Points (Moffat, Bacton IUK and Bacton BBL). The information will be issued to ENTSOG by D+1, where D is the day of Interruption. Note: This is interruption resulting from scaleback - entry capacity. This is not interruption due to shortage of supply.

12 12 MIPI European Transparency Project (ETP) Data to be supplied to the ENTSOG platform - further detail (for new items) The following data items will be submitted to ENTSOG:- Capacity and Tariff data Capacity and Tariff data is currently provided by a manual process and is already viewed on the ENTSOG platform:- www.gas-roads.eu As part of MIPI ETP this data will become part of an automated service. The data itself will not change.

13 13 MIPI European Transparency Project (ETP) Data to be supplied to the ENTSOG platform - further detail (for new items) Sample of screens to be populated (including automated capacity and tariff data). Note: Data is for illustration purposes only, using data extract from other service providers

14 MIPI Section

15 15 MIPI European Transparency Project (ETP)  Incorporation of all graph changes related to MIPI ETP requirements (circled green).  Link “Real Time Flow Data (Volume)” on the left hand side will be renamed to “System Entry Point Flow Data” (circled blue).  Forecast graphs to be reduced to one from three (circled red).  The text “Beach and LNG” to be renamed “Beach including Norway” in Actual Supply graph (circled orange).  “Hover Over” issue present in the map when navigating from one map to another will be resolved.  “Hovering Over” number of characters will be increased from 250 to 400.  Unit conversion information will be displayed in the “Help” menu of Prevailing View (circled black). Changes to prevailing View * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

16 16 MIPI European Transparency Project (ETP) Unit Conversions Unit conversion information will be displayed in the “Help” menu of Prevailing View. A footnote will be added at the footer of the Prevailing View, Report Explorer and at the footer of all relevant reports to act as a reminder that conversion information is available in the “Help” menu of Prevailing View. Conversion Factors National Grid publishes data in UK standard units. To convert to other units, please refer to the following conversion factors:- 1) kWh (25oC, 0oC, 1.01325 bar) = 1 kWh (15oC, 15oC, 1.01325 bar) x 0.9990 2) Normal mcm volume = Standard mscm (UK) x 0.9479 3) mscm to kWh = mscm * 1000000*CV (39.6)/3.6 4) kWh to mscm = kWh/1000000/CV (39.6)*3.6 The above formulas are to be used as a guide only.

17 17 MIPI European Transparency Project (ETP) Changes to Report Explorer Part 1 As a result of new reports and the modification of some existing reports the structure of Report Explorer will be updated. Keys Blue text - Existing reports remaining unchanged. Black Text - Existing report remaining unchanged but changed location to the MIPI platform. Red text - New reports Green text - Existing reports being updated.

18 18 MIPI European Transparency Project (ETP) Changes to Report Explorer (continued) Part 2 As a result of new reports and the modification of some existing reports the structure of Report Explorer will be updated. Keys Blue text - Existing reports remaining unchanged. Black Text - Existing report remaining unchanged but changed location to the MIPI platform. Red text - New reports Green text - Existing reports being updated.

19 19 MIPI European Transparency Project (ETP) Summary of Report changes in MIPI Report NameTypeTimings Nomination Report (including re-nominations) NEW At 17:00 D-1 (Initial Nomination) 06:00, 12:00, 18:00, 24:00 D (re-nominations) and a final at 06:00 D+1. Aggregate Allocation Report NEWOnce a day (22:45 hours). NTS EOD - Entry Points (Physical) Report NEW Thrice a day (at 12:30, 15:30, 18:30 hours, the last two publication runs will be reserved for amended data if any). Storage and LNG Report NEWOnce a day (at 16:00 hours). Slide 17 - Report Explorer details the path for these new reports.

20 20 MIPI European Transparency Project (ETP) Summary of Report changes in MIPI Report NameTypeTimings Actual Offtake Flows (AOF) Report ENHANCED Thrice a day (at 12:30, 15:30, 18:30 hours, the last two publication run will be reserved for amended data if any). Daily Operation Information (NORD01C) Report ENHANCED No change to current timings. Static text will added to explain the balancing system. Demand in kWh to be displayed. Exit Capacity Applications (separate link) ENHANCED As soon as the report is uploaded. Capacity Reports - Daily Auctions Summary Report (Within Day) - Capacity Available Report (NORD07) - Long term Capacity Auctions Report - Future Entry Capacity Traded (NORD03a) ENHANCED Additional ASEP’s added (refer to slides 29 - 30) Note: The path for these reports will not be affected. Slides 17 and 18 - Report Explorer details the path for these enhanced reports.

21 21 MIPI European Transparency Project (ETP) Summary of Report changes in MIPI Report NameTypeTimings Operational Summary Report CHANGE OF LOCATION Daily at 16:15hrs Calorific Value Report CHANGE OF LOCATION Daily at 10:30hrs NTS Linepack Report CHANGE OF LOCATION As soon as the report is uploaded. NTS Exit Flexibility Utilisation Report CHANGE OF LOCATION As soon as the report is uploaded. These reports are currently displayed under:- www.nationalgrid.com/uk/Gas/Data/Operational_Summary. Slide 17 - Report Explorer details the new path for these reports.

22 22 MIPI European Transparency Project (ETP) New Report Nomination Report * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Data will be published in this report at site and aggregate levels. Aggregate levels listed below:

23 23 MIPI European Transparency Project (ETP) New Report Allocation Report * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Data is to be published in this report at aggregate levels only.

24 24 MIPI European Transparency Project (ETP) New Report NTSEOD Physical Report * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

25 25 MIPI European Transparency Project (ETP) New Report Storage/LNG Data Report * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Note: Data is to be published in this report at aggregate levels only. Each Storage & LNG operator will be obligated to publish their own data on their own website. * Subject to agreement with Storage and LNG Operators.

26 26 MIPI European Transparency Project (ETP) Enhanced Report AOF Report This report now includes:- - Calorific Value (MJ/scm) - Energy (kWh) * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

27 27 MIPI European Transparency Project (ETP) Enhanced Report Daily Operation Information Report Static description for NTS balancing system 1) In order to meet EU obligations an additional text field will be added to provide an explanation of the information/data provided in this report. 2) Demand in kWh to be displayed. * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Static Text

28 28 MIPI European Transparency Project (ETP) Revised Menu/Report “Exit Capacity Applications”. Functionality 1.The user selects the ‘Application Type’ from the drop down list and the ‘Report Type’ from the second list. 2.When the user selects an “Application Type” the dropdown menu for “Report Type” auto filters to show only the related reports for the selected Application Type, this is based on the naming convention of the uploaded file. 3.The user selects the “From Year” and the “To Year” from the drop down list 4.On click of “Submit Query” a list of all the reports within the selected time frame will be displayed in descending chronological order. The user can view and save the report. Note: The search functionality provided (by selecting options in the drop down menus) will enable the users to search for any specific report for any selected application window within a specified date range. All the application windows that are active within this selected date range will be displayed. * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

29 29 MIPI European Transparency Project (ETP) Additional ASEP’s Additional ASEP's, including the storage ASEP's will be added to MIPI. These will be reflected in different capacity reports within Report Explorer and where relevant updated in Prevailing View and Data Item Explorer. WF WYTCH FARM ONSHORE X ASEP ID ASEP Changes to Prevailing View Changes to Report Explorer Changes to Data Item Explorer

30 30 MIPI European Transparency Project (ETP) As a result of the additional ASEP's the following reports will be modified accordingly:- Daily Auctions Summary Report (Within Day) (DASW Report) 1.Aldborough Storage will be renamed to Garton ( in line with Capacity Reports). 2.The data for the following sites will be included Garton, Burton Point, Barton Stacey, Dynevor Arms LNG, Hatfield Moor Onshore, Caythorpe Onshore, Partington LNG, Wytch Farm Onshore, Cheshire Storage, Fleetwood and Milford Haven. Capacity Availability Report (NORD07) 1.Aldborough Storage will be renamed to Garton. 2.The data for the following sites will be included Garton, Barton Stacey, Caythorpe Onshore, Cheshire Storage and Fleetwood. Future Entry Capacity Traded Report (NORD03a) 1.The data for Caythorpe Onshore, Cheshire Storage, Fleetwood, Hatfield Moor Onshore, Wytch Farm Onshore and Barton Stacey will be included. Long Term Capacity Auctions Report 1.Aldborough Storage will be renamed to Garton. 2.The data for the following sites will be included Garton, Barton Stacey, Caythorpe Onshore, Cheshire Storage and Fleetwood. Entry Capacity Trading Report Graph change - NORD03 NORD03 graph will be changed to accommodate all new ASEP's. Additional ASEP’s - Reports Enhanced Reports - due to additional ASEP’s only

31 31 MIPI European Transparency Project (ETP) Change of Location Operational Summary Report Slide 17 - Report Explorer details the new path for this report. * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

32 32 MIPI European Transparency Project (ETP) Slide 17 - Report Explorer details the new path for this report. Change of Location Calorific Value Report * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

33 33 MIPI European Transparency Project (ETP) Slide 17 - Report Explorer details the new path for this report. Change of Location NTS Linepack Report(s) Two reports will be provided to display data for D+1 and D+6. * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Note: The NTS Actual Linepack reports will be displayed from 1 st October 2010 at the following location:- www.nationalgrid.com/uk/Gas/Data/ Operational_Summary. This will change following implementation of MIPI ETP.

34 34 MIPI European Transparency Project (ETP) Slide 17 - Report Explorer details the new path for this report. Change of Location NTS Exit Flexibility Utilisation Report Two reports provided to display data for D+1 and D+6. * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

35 35 MIPI European Transparency Project (ETP) Changes to Data Item Explorer  To include all the new MIPI ETP related data items in Data Item Explorer.  The sort function - by clicking the column header in Data Item Explorer will be more emphasised. (circled red)  The display of decimal places in both the Data Item Explorer screen and in the downloaded excel screen will be the same. (circled green)  Text amendments - for example “ApplicableAt” will be changed to “Applicable At” (circled black). * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

36 36 MIPI European Transparency Project (ETP) Data Storage All data items will be available online for a 5 year rolling basis:-  New data items - data will be collated from 1st October 2010 onwards and therefore 5 full years of data will be available from 30 September 2015.  Existing data items - Will gradually build up after implementation (15th November 2010) from 2 years to 5 years, therefore 5 full years of data will be available from 15th November 2013. Reminder: Data can be extracted and downloaded in xml format. Data Dictionary The Data Dictionary has been be updated to reflect new data items. Link: www.nationalgrid.com/uk/Gas/Data/help

37 37 MIPI European Transparency Project (ETP) Consistent Units of measure to be applied across MIPI Report Explorer, Data Item Explorer, Prevailing View and SORM graphs will have consistent units of measure displayed: Current MIPI Standard UnitNew MIPI Standard Unit Mcmmscm Calorific Value (mj/cu.m)MJ/scm p/thermp/thm mcm/dmscm/d GWh/dayGWh/D KwhkWh

38 38 MIPI European Transparency Project (ETP) Updated information on how we deliver gas The description on “How Gas is Delivered” http://www.nationalgrid.com/uk/Gas/About/How+Gas+is+Delivered/ will be updated to give a more precise description on how we deliver gas. This will also show which TSOs we are connected to (i.e. BBL, IUK, Gaslink).

39 39 MIPI European Transparency Project (ETP) Graphic Package As part MIPI ETP, the current graphic package will be upgraded to enable the following:  Multiple axes on the one graph  Rolling graphs  Stacked area graphs  When graphs and charts are printed, there will be improved print quality - no “ghosting”. Note: No changes to customer set up required.

40 40 MIPI European Transparency Project (ETP) Merging of the Forecast Graphs Forecast Demand, Supply and Predicted Closing Linepack (PCLP) graphs will be merged into one graph to replace the three existing graphs. * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Note: Graphs under development. GBA Trigger will be added to this graph.

41 41 MIPI European Transparency Project (ETP) Actual Demand Graph change One graph will include IUK and storage injection (shown), and another will exclude IUK and storage injection. * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Note: Graphs under development. Additional colours will be added.

42 42 MIPI European Transparency Project (ETP) Composite Weather Variable graph change Ranges will be displayed in lighter shaded colour and actuals in black for greater contrast. * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

43 43 MIPI European Transparency Project (ETP) Actual Supply graph change LNG will be shown as a separate area, plus interconnectors and storages to be included on stacked graph. * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

44 44 MIPI European Transparency Project (ETP) Rolling Stock Graphs Links will be provided in the graph page to navigate to “Next Season” or the “Previous Season” * The data displayed is for illustration purposes only and should not be used/referred to as actual data. Note: Graphs under development. New Navigation buttons will be visible on the “right” hand side of the screen.

45 45 MIPI European Transparency Project (ETP) Aggregate LNG graph change A graph to show actual stock, available capacity and percentage full. * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

46 46 MIPI European Transparency Project (ETP) New Actual Storage Stock graph A graph to show actual stock, available capacity and percentage full. * The data displayed is for illustration purposes only and should not be used/referred to as actual data.

47 47 MIPI European Transparency Project (ETP) Changes to SORM graphs  Axis font format will be clear and consistent for all the graphs.  SORM26, SORM06 will have both the axis labelled.  SORM06 and SORM05 will have consistent date ranges.  The bars in SORM03 report will be of the same size.

48 48 MIPI European Transparency Project (ETP) Note: The current API functionality should not be affected. Users with API’s will continue to receive the data requested. For API information including API data names (including new data items) please access the following link: www.nationalgrid.com/uk/Gas/Data/help Summary – what we have covered in MIPI ETP  4 NEW MIPI reports  4 ENHANCED MIPI reports (inclusive of the new Capacity Application screen)  4 MIPI reports CHANGING LOCATION  New graphical package (new and enhanced graphs)  4 new data items to ENTSOG  2 data items now (automated) to ENTSOG  Increased on-line data storage (5yrs)  Provision of unit conversions  Consistent Units of Measure across MIPI  Additional ASEP’s added to MIPI reports

49 49 MIPI European Transparency Project (ETP) Further Information This presentation has covered all changes resulting from the MIPI ETP project. For further information on the 3rd package of EU energy market legal obligations please refer to the European Commission Energy Website:- http://ec.europa.eu/energy/gas_electricity/third_legislative_package_en.htm

50 50 MIPI European Transparency Project (ETP) Any general queries? Please contact us on:01926 65 6474 This service will only be available during the office hours of 09:00 to 16:30 on weekdays. Alternatively you can submit any queries to:- sysop.centre.reporting@uk.ngrid.com


Download ppt "MIPI European Transparency Project (ETP) 10 th September 2010."

Similar presentations


Ads by Google