Download presentation
Presentation is loading. Please wait.
Published byGinger Jennings Modified over 8 years ago
1
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output 3 best muons on optical fibers to Sector Processors in Counting Room Clock and Control Board Trigger Motherboard: Input data from Cathode Strips & Anode Wires Full Crate Test validating data flow from Trigger Motherboard PPP’s to Muon Port Card PPP underway now 2003 Structured beam test validated trigger logic performance
2
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 2 CSC Trigger Muon Port Card & Sector Processor Mezzanine card TLK2501 serializers OptomodulesGTLP Receivers VME Interface (glue logic) 15 X 1.6 Gb/s optical links from MPC Xilinx Virtex-2 800 User I/O Muon Port Card (Rice): PPP fully tested stand-alone Testing w/ TMB, SP, CCB Total needed: 60 Sector Processor (Florida): PPP: individual functions tested Full Track Finder Firmware now being incorporated Total needed: 12
3
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 3 CSC Sorter & Clock Boards Muon Sorter (Rice): PPP: all inputs fully tested Integration tests w/Sector Processor underway Total needed: 1 Clock & Control Board (Rice): Rad-tolerant, total needed: 61 Testing underway In peripheral crates & track-finder Basic VME interface uses discrete logic Critical functions immune to SEU VME/JTAGINTERFACE GTLPBACKPLANEINTERFACE MEZZANINECARD LVDSDRIVERS AND SCSI-3 CONNECTORS New TTCrq mezzanine w/QPLL ASIC
4
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 4 Full Regional Cal. Trigger Crate (Wisconsin) 18 Such Crates make up the full RCT System covering | |<5 & 0 < < 2 . Rear: Receiver CardsFront: Electron, Jet, Clock Cards
5
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 5 Cal Trigger Receiver Cards (Wisconsin) Front with 2 of 8 mezzanine cards & 3 Adder ASICs DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Back with all Phase & Boundary Scan ASICs Pre-Production full feature RC and all ASICS fully validated. All 1420 mezzanine link cards produced and tested at UW Link Integration tests with ECAL & HCAL successful RC production started and 2 boards validated, expect remainder of order within a couple of months (152). Bar Code
6
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 6 SORT ASICs (w/heat sinks) EISO Bar Code Input Receiver Mezz. Card BSCAN ASICs Sort ASICs BSCAN ASICs Phase ASIC DC-DC Converters Clock delay adjust Clock Input Oscillator Production Electron Isolation Card & Prototype Jet-Summary Card (Wisconsin) Electron Isolation Card Production testing started 11/143 done Jet/Summary Card Full function prototype tested Full crate test - all output paths verified, electron sort, jet output all OK PPP being built, 25 needed Integration test with Global Cal Trigger successful Clock Card Production testing started 5/25 done
7
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 7 Installation in Underground Counting Room Expect start in June ‘05 Racks & Infrastructure installed Sufficient time for installation & some testing but not for full commissioning w/ detectors Significant time needed for integration in synchronous pipelined system Surface tests in SX5 With both HCAL and EMU Verify trigger functions & interfaces by testing w/detectors on surface at CERN. Use to reduce commissioning time as much as possible. Will check as much on surface before gaining access to underground facilities. Planned for October ‘04 - May ‘05 Tests in Electronics Integration Facility Set up central core of critical racks Underground Counting Room Trigger Installation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.