0 Transformation of a Power System September 21, 2012
2
Transformation of Energy Resources 1 2010 2027 8.6% *by 2020 * * 1
3
Existing Renewable Projects Regional Map Columbia River Corridor: Pebble Springs Wind Willow Creek Wind Linden Wind Farm Windy Point Wind Columbia River Corridor: Pebble Springs Wind Willow Creek Wind Linden Wind Farm Windy Point Wind Milford Wind I / II Pleasant Valley SW WY Wind STS Transmission Adelanto Solar Farm STS Transmission Adelanto Solar Farm Gas Pipeline – Landfill / Biogas Small Hydro – Aqueduct Pine Tree Wind Pine Tree Solar Small Hydro – Aqueduct Pine Tree Wind Pine Tree Solar Barren Ridge-Inyo Transmission (Future) Pacific DC Transmission Local In-Basin Solar Mead Transmission New Solar – 250 MW New Solar – 185 MW Mead Transmission New Solar – 250 MW New Solar – 185 MW
4
3 Renewable Energy Breakdown
5
RPS by technology LADWP Energy Mix Note that Coal is being reduced from 39% to 27% as shown Projected 2020 Resource Mix
6
PROJECTS IN SERVICE PROJECTS PLANNED & UNDER CONST. DEFICIT GOAL 33% RPS Deficit without New Solar Projects
7
RPS Project Selection Principles Geographic Diversity of projects is important Maximize use of existing LADWP transmission & land Maintain options/flexibility Regionally “cluster” renewable projects to achieve efficient operation and maintenance Ownership of projects using proven technology
8
Future LADWP Energy Projects Solar: In-Basin Solar (on-going) Pine Tree Solar (Dec 2011) -10 MW Adelanto Solar (Feb 2012) – 10 MW Owens Valley (2018) - 200 MW Wind: Pine Canyon (2018) – 120 MW Geothermal: Imperial County (2017) – 50 MW Power Purchase Agreements: Over 200 responses to Jan 2011 RFP Solar, Geothermal. Wind, and Biogas Transmission Upgrades: Barren Ridge Renewable Energy T/L (2016/17)
9
5 Solar Energy Breakdown
10
OTC-Repowering Mandate Eliminating ocean water for cooling requires careful sequencing to meet targets Target Compliance Date 9 Currently Underway
11
Navajo Coal Replacement by 2015 Part of the LADWP Power Supply Transformation 10
12