Gas Coordination Meeting Cabling
2
General Philosophy Cables between racks within the Surface Gas Building or between racks within the Underground Gas Building will be purchased and installed by PH-DT1/Gas Cables between areas and between racks in the UX Cavern will be purchased and installed by experiment groups to PH-DT1/Gas specification Where Possible, Use of Standard Cables available from Cern Store – main exception is CAN bus cable for which the Cern standard is insufficient for the distances involved.
3
Gas Racks Typical Surface Area Entrance to Shaft Surface Gas Buidling Control Rack CAN Bus 3 P+N Profibus PA TT Signal Cable Profibus DP Voltage Reference For CAN Bus Ethernet
4
Distribution Rack Gas Racks Typical Underground Area Profibus DP CAN Bus Voltage Reference For CAN Bus Profibus PA Cavern Underground Gas Room/Area Signal Cable Control Rack Valve Islands Valve Positioner Electronic Rack Signal Cable CAN Bus Flow Meter DC Power 3 P+N Profibus PA PT ATLAS Underground Area Ethernet
5
Extract From Typical Cable Schedule