P16462: Wind Energy Base Station MSD II Phase I Update 2/5/2016 Team Members Aleksandr Kim Laura Arcinegas Kevin “KC” Collins Sarah Collmus Kevin “Kevlar” Larkin Suk Min Lee Mike Ostaszewski Team Guides Edward Hanzlik Russell Phelps Thomas Bitter Customer Mario Gomes Consulting Pilot Phil Nguyen
2
Agenda Address MSD I Phase V customer and guide concerns (Action Items) Completed circuit and wiring diagram Gear, motor and reel connectivity Test plan update Phase Deliverables Gate Review Materials Week 5 Vision Imagine RIT Plan/Elevator Speech
3
Final System Concept Major changes: Better gear system design
4
Action Items Update
5
AndyMark 9015 Motor (am-0912) Specifications: Physical Specs: -Overall Length : 8.19cm (3.19 inches) -Motor Body Length 5.68cm (2.24 inches) -Weight : 226.79g (0.5 pound) Performance Specs : -Voltage : 12 VDC -RPM : 16,000 -Free current : 1.2A -Max power : 179W -Stall torque : 60.64 oz-in (428m-Nm) -Stall current : 63.8 A connect with 26.9:1 gearbox Final Motor Selection The motor and corresponding bracket arrived this week and is in the Energy and Motion lab (motor and two batts are checked)
6
Checked two WKA12-5F2 batteries - active Tested motor - cw/ccw rotation, visual inspection Battery & Motor
7
●Control ●Directional Control of the H-Bridge Final issues before testing
8
Directional control of H-Bridge Logic input voltage (3.3V - 5V) -> 4.4V
9
32 Tooth 24 Tooth Gears
10
Permissible Surface Speed (1 of 2)
11
Permissible Surface Speed (2 of 2)
12
Axial Load/Compressive Strength
13
17604900 Compressive Strength
14
Out of Stock Gear Solution
15
Power Transmission Shaft Plan to order a solid cylindrical shaft and machine in D profiles where the collars are located. Upgraded to stainless steel for added corrosion resistance.
16
Power Transmission Shaft Calculation performed to determine maximum deflection of the shaft under load. Maximum deflection = 0.0378 in.
17
Power Transmission Shaft Calculation performed to determine the risk of shaft buckling. The minimum force required to cause our shaft to buckle is 67,566 lbs.
18
Collars Upgraded to stainless steel collars for added corrosion resistance. Waiting to hear from McMaster on set screw strength properties.
19
Test Plans
20
Eng. Requirements Update
21
Planned Tests - Week 5 We’re currently planning on conducting the following tests: Tether Abrasion [Sarah] Tether Wrap [Sarah] Tether Strength [KC] Battery [Kevlar, Suk] Full Control System [Kevlar, Suk] Gear Length Timing Belt Alignment [Laura] Iglide J Plastic Bearing Friction [Laura]
22
Phase Deliverables
23
Problem Tracking (1 of 2)
24
Problem Tracking (2 of 2)
25
BoM - Current Green - Parts that we received Yellow - Parts currently on order Orange - Parts we need to order
26
MSD II/Phase VI Plan
27
Risk Management
28
Gate Review Materials
29
Imagine RIT Plan Manning the booth Exactly two members will be present at all times. Each team member serves 2 hours minimum, either back to back or separately. Technical Presentation Show Makani and Ampyx videos, our own flight videos (unless we produce bad quality videos or the project doesn’t work) Poster Kid-Friendly Presentation Suk’s Wind Turbine Science Kit Kite Pinwheels Wind draft parachute
30
Imagine RIT Elevator Speech The wind energy base station high altitude glider is our team’s project. This project seeks to explore the option of using gliders attached to a tether to generate power to reduce or eliminate the need for large, costly windmills and to take advantage of the stronger and more consistent winds found at higher altitudes. This is a fairly new area that is just gaining traction in the professional world with companies like Makani, Ampyx, and Google each trying to come up with the most efficient design. To generate this energy in our type of glider design, the glider is flown in a ovular path up in the air. When flying into the wind, the tether is reeled in. This is because the glider slows down and the reeling in motion compensates for the slack generated by the loss of speed. When flying with the wind, the tether is reeled out. The tether winds around a reel that is connected to a generator, causing generation of electricity due to the mechanical energy. Ideally the power generated will be greater than the power used to reel in. This was proven theoretically by Glen Gavi’s master’s thesis and we are seeking to prove it in a practical setting. Our team of seven engineers from the mechanical electrical sectors is the first step of this research group, so will be providing a path parallel to the ground is possible by running the glider without a generator component. Our tasks included designing the base structure itself, a power transmission system, a bridle system, and various electrical equipment. [Whoever is talking can talk more about what they did here]
31
Team Critique
32
Thank you! Any further questions will be taken at this time.
33
Part Drawings
34
Reel Support Column
35
Ring Support Column
36
Ring Structure
37
Reel Drum
38
Base Plate