Presentation is loading. Please wait.

Presentation is loading. Please wait.

Code Administration Code of Practice Tim Davis KPIs Q1 2011.

Similar presentations


Presentation on theme: "Code Administration Code of Practice Tim Davis KPIs Q1 2011."— Presentation transcript:

1 Code Administration Code of Practice Tim Davis KPIs Q1 2011

2 Critical Friend Number and percentage of survey respondents who stated they were ‘satisfied’ or better with the assistance offered by the JO –38 responses, 100% satisfied or better

3 Quality of assessment Ofgem ImplementReject PanelImplement91 Reject01 Based on Ofgem decisions in 2011 No Reports “sent back” by Ofgem 10 Ofgem Decisions accord with Panel (91%)

4 Effective communication Glossary and plain English summary to be provided with reports –Part of standard documentation Average number of respondents to consultation –9.1 (16 Consultations)

5 Efficient administration (1) Percentage of papers published outside of modification rules requirements –0% Formal UNC Modification Papers (Mods, DMRs, FMRs) –23% Meeting Papers 69 Meetings 366 Papers

6 Efficient Administration (2) Number and percentage of reports submitted to the authority in line with original timetable –One Number of extensions to timetable requested –Fourteen

7 Efficient Administration (3) Average time between:Days Proposal being raised and submitted for decision 123 Proposal being submitted for decision and decision being published 112 Decision and implementation (separately identifying systems and non-system changes) 3 (no central systems changes)

8 Implementation costs Number and percentage of reports for which implementation cost estimates were available for consultation –100% Accuracy percentage difference (whether higher or lower) between estimated and actual implementation costs –NA

9 Code Administration Code of Practice Tim Davis KPIs Q1 2011


Download ppt "Code Administration Code of Practice Tim Davis KPIs Q1 2011."

Similar presentations


Ads by Google