Download presentation
Presentation is loading. Please wait.
Published byLawrence Wells Modified over 9 years ago
1
Groundbreaking Ceremony Clemson University Restoration Institute October 28, 2010 Clemson University Wind Turbine Drive Train Testing Facility
2
Conceptual Design
3
Special Thanks to our Project Partners Public Partners Naval Complex Redevelopment Authority State of South Carolina South Carolina Ports Authority South Carolina Public Railways Savannah River National Laboratory Private Partners Renk Test Systems Fluor SCE&G CMMC EcoEnergy James Meadors Tony Bakker Economic Development and Innovation
4
15 MW Capacity with Dynamic Load Applicator
5
7.5 MW Capacity with Static Load Applicator Economic Development and Innovation
6
Clemson University Restoration Institute Phase I Conceptual Design
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.