Download presentation
Presentation is loading. Please wait.
Published byKristian Page Modified over 8 years ago
1
doc.: IEEE 802.11-12/1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: 2012-09-27 Authors: IEEE 802.11aj Sept 2012 Closing Report
2
doc.: IEEE 802.11-12/1200r0 Submission Abstract This document is the closing report for IEEE 802.11aj Task Group for the Sept 2012 session in Beijing China. Sept 2012 Slide 2Xiaoming Peng / I2R
3
doc.: IEEE 802.11-12/1200r0 Submission Work Completed (1/2) Reviewed New member orientation – 11-12/0628r1 Reviewed Approved IEEE 802.11aj PAR & 5C –PAR – 11-12/0149r9 –5C – 11-12/0141r7 Reviewed Task Group Logistic – 11-12/0827r2 Reviewed Task Group Meeting Schedule Result of Task Group Election –Task Group Chair: Xiaoming PENG –Task Group Vice Chair: Eldad Perahia –Task Group Vice Chair: Haiming WANG –Secretary: Peng HAO Sept 2012 Xiaoming Peng / I2RSlide 3
4
doc.: IEEE 802.11-12/1200r0 Submission Work Completed (2/2) Reviewed 802.11aj Process Over – 11/12-1195r0 Reviewed the following documents –TGad Selection Procedure – 11/09-0935r5 –TGac Selection Procedure – 11/09-0059r6 –TGad Usage Model – 11/07-2988r4 –TGn Usage Model – 11/03-0802r23 –TGad Functional Requirement – 11/09-0228r5 –TGad Channel Model – 11/09-0334r8 –TGad Evaluation Methodology – 11/09-0296r16 Three submissions were presented –11/12-1197r0 –11/12-1198r0 –11-12/1196r1 Sept 2012 Xiaoming Peng / I2RSlide 4
5
doc.: IEEE 802.11-12/1200r0 Submission IEEE 802.11aj Meeting Schedule 802.11aj #DateMeeting VenuePlenary/Interim 1Sept 24-28, 2012Beijing, China802.11aj/CWPAN (China Interim) 2Nov 11-16, 2012San Antonio TX, USAPlenary Jan 13-18, 2013USAInterim 3Jan 21-25, 2013Shenzhen China (TBC)802.11aj/CWPAN (China Interim) 4March 17-22, 2013Orlando, Florida, USAPlenary May 12-17, 2013Big Island, Hawaii, USAInterim 5April 22-26, 2013Beijing, China802.11aj/CWPAN (China Interim) 6July 14-19, 2013 Geneva, SwitzerlandPlenary 7Sept 15-20, 2013Nanjing China802.11aj/CWPAN (Co-located Interim) 8Nov 10-15, 2013Dallax TX, USAPlenary Jan 13-18, 2014Los Angeles, CA, USAInterim 9Jan 6-10, 2014Sanya, China802.11aj/CWPAN (China Interim) 10March 16-21, 2014Atlanta, USAPlenary May 12-17, 2014Hawaii, USAInterim 11May 20-24, 2014Beijing, China802.11aj/CWPAN (China Interim) 12July 13-18, 2014San Diego California, USAPlenary Sept 15-20, 2014Kobe, Japan (TBC)Interim 13Sept 23-27, 2014Chengdu, China802.11aj/CWPAN (China Interim) 14Nov 10-15, 2014San Antonio Texas USAPlenary 802.11aj meeting on Wednesday, Thursday CWPAN meeting on Monday, Tuesday and Friday 5
6
doc.: IEEE 802.11-12/1200r0 Submission Goals for November Review TG Selection Procedure Review TG Evaluation Methodology Review Usage model Review TG Functional Requirement Review Channel model New Submission and Presentation Sept 2012 Xiaoming PengSlide 6
7
doc.: IEEE 802.11-12/1200r0 Submission Conference call times Oct 25 (Thursday) 17:00-18:00 (Pacific Time) Sept 2012 Xiaoming PengSlide 7
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.