UTILISATION OF IDLING CAPACITY OF CAPTIVE POWER PLANTS-A VIABLE ALTERNATIVE BHANU BHUSHAN DIRECTOR(OPERATION),POWERGRID
2
POWER SECTOR TODAY……. POWER SHORTAGES LOAD SHEDDING ROSTERING POWER CUTS BROWN OUTS BUT STILL OUR CAPTIVE AND CO-GENERATION REMAIN UNDER UTILISED
3
CAPTIVE AND CO- GENERATION PLANTS GETTING THEM INTO THE GRID
4
LET’S TALK MONEY…… THE CPP MUST GET A PRICE BETTER THAN HIS INCREMENTAL COST THE PURCHASER SHOULD GET THE POWER AT THE BEST PRICE THE SEB’S/TRANSCO/DISCOM’S ARE THE INEVITABLE INTERFACE – THEIR SUPPORT IS VITAL TO THE SUCCESS OF THE DEAL
5
WHAT WAS STOPPING US BEFORE? MONOPOLISTIC ATTITUDE/MINDSET ABSENCE OF COMMERCIAL FRAMEWORK ARCHAIC RULES AND REGULATIONS
6
THE SEB’S CONCERNS THE TRANSMISSION SYSTEM MUST NOT GET OVERLOADED LOSSES MUST NOT INCREASE SEB MUST NOT LOSE FINANCIALLY
7
THE AVAILABILITY BASED TARIFF – A FRAMEWORK FOR FACILITATING TRADE
8
AN EVERY DAY EXAMPLE SEB CPP + STEEL PLANT CAPACITY: 2X65 MW RATE: 100p/UNIT REQUIREMENT: 120±10 MW CAPABILITY: 120 MW AVAILABILITY: FULL FOR 10 MONTHS, ONE UNIT ON OH FOR 1 MONTH EVERY YEAR CONDITIONS 1)30 MW MINIMUM DEMAND 2)70 MW MAX DEMAND FOR 2 MONTHS REPURCUSSIONS: FOR 10 MONTHS THE CPP RUNS AT PART LOAD OF 90 MW DUE TO CONDITION 1) ABOVE
9
A POSSIBLE SOLUTION SEB AND CPP AGREE ON A SCHEDULE – SAY 70 MW FOR 2 MONTHS AND 30 MW FOR REST OF THE YEAR. ANY DEVIATION FROM THE ABOVE WOULD ATTRACT A FREQUENCY LINKED UI RATE.
10
A WIN-WIN SITUATION IN CASE THE FREQUENCY IS LOW: –CPP GENERATES MORE AND BENEFITS FROM THE UI. –SEB BENEFITS BECAUSE IT DOES NOT HAVE TO DRAW FROM THE GRID AT HIGH PRICE. –MORE LOAD IS SERVED.
11
A WIN-WIN SITUATION IN CASE THE FREQUENCY IS HIGH: –CPP GENERATES LESS. –SEB BENEFITS BECAUSE IT DRAWS POWER FROM THE GRID AT A LOW PRICE. –MERIT ORDER IS ACHIEVED. THE CPP CAN DECIDE LEVEL OF GENERATION DEPENDING ON THE FREQUENCY AND ITS NETT INCREMENTAL COST
12
ADVANTAGES FOR CPP SIMPLICITY – A FREQUENCY METER IS ALL THAT IS REQUIRED NO TELEMETRY OR COMMUNICATION WITH SLDC/SEB NO PRICE TO BE NEGOTIATED CPP DOES NOT HAVE TO SEARCH FOR BUYER CPP CAN MAKE A REASONABLE PROFIT.
13
ADVANTAGES FOR SEB IMPARTIAL AND UNBIASED SYSTEM NEED NOT WORRY ABOUT CPP UNDER-GENERATING AT LOW FREQUENCY AND OVER- GENERATING AT HIGH FREQUENCY FRAMEWORK FOR SETTLEMENT IS ALREADY AVAILABLE
14
A POSITIVE APPROACH IS ALL THAT IS NEEDED