SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003
2
Keyes - 22 January 2003 Slide 2 of 6 STScI Integrated Scheduling System Bench Timing Testing of Phases 1-5 completed (T. Wheeler) – – Essential for SMGT-readiness certification – – Target Acquisition FSW component not yet tested – – Unique Timing SMS and Reconfiguration SMS-suite > > FUV and NUV completed successfully – – STScI Commanding Certification SMS > > NUV completed successfully > > FUV Commanding Certification identified minor issue Hand-edited SMS ran successfully > > FUV testing requires FUV detector ETU > > Will re-test remotely (including Target Acquisition) within 6 weeks – – Testing and results are very positive!
3
Keyes - 22 January 2003 Slide 3 of 6 New Launch Date Impacts Ground System Development – – SMOV4-related > > SMGT now planned for late June, 2004 > > Special commanding definition now required by September, 2003 COWG will establish requirements in spring > > Requirements (other activities e.g., on-orbit calibration) : definition Sep-Nov 2003 – – Revised STScI Phase Development Plan > > Includes new work items and updates
4
Keyes - 22 January 2003 Slide 4 of 6 COS Phase Development Plan (Rev 8, 01/06/03) Phase 1 (1/1/00 – 6/30/00) vMacro Development vReconfigurations Phase 2 (7/1/00 – 12/31/00) vNUV Timetag Mode + Darks vFUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) vFUV & NUV Accumulation Science Exposures vFUV & NUV Target Acquisition Exposures vFUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) vAperture Alignment Exposures vOSM1 Focus Alignment Exposures vOSM1 Rotation Alignment Exposures vOSM2 Rotation Alignment Exposures vFUV & NUV FP Split Exposures Phase 5 (1/1/02 – 6/30/02) vFUV & NUV GO Wavelength Calibration Exposures vFUV & NUV Flat Field Lamp Calibration Exposures vFUV & NUV Automatic Wavelength Calibration Exposures vSAA Contours Phase 6 (7/1/02 – 12/31/02) vFUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) vFUV & NUV Flat Field Lamp Rework vCoordinated Parallels Phase 8 (7/1/03 – 12/31/03) vOSM Overheating Avoidance vSMGT Preparations vSMOV Special Commanding vFUV & NUV Anomalous Recovery vFUV & NUV Initial Turn-on Phase 9 (1/1/04 – 6/30/04) vTRANS ovratalstart, ovratalend Phase 10 (7/1/04 – 12/31/04) vFUV & NUV Lifetime Adjustments
5
Keyes - 22 January 2003 Slide 5 of 6 STScI Calibration Pipeline Status OPUS – – Successful testing with integrated SI data (from N 2 purge) – – Testing against latest DM-06 and Target Acquisition data suite planned – – COS Keyword Dictionary in preparation CALCOS – – Most modules are now complete – – Successful testing with integrated SI data (from N 2 purge) – – Draft of ICD-47 is being reviewed
6
Keyes - 22 January 2003 Slide 6 of 6 STScI Thermal-Vac Support STScI Coordination with IDT (STScI lead: Sembach) OPUS support of Thermal-Vac – – MOU requires STScI to deliver T-Vac version of OPUS two months in advance of T-Vac – on-track > > Require test (simulator) target acquisition images 2-4 weeks in advance of this date if OPUS delivery is to include target acquisition functionality > > Minor T-V logistics issues being worked (e.g., additional k/w) > > Coordination ongoing with IDT – all nominal STScI Staffing Support at T-Vac – – All STScI COS Instrument Scientists on-site on rotating basis