Download presentation
Presentation is loading. Please wait.
Published byDwayne Barber Modified over 9 years ago
2
2 L&D 11 March 2013 TEC Meeting
3
Agenda 1. Feedback DTO-LD working groups 2.HR-LD Objectives for 2013 3.Feedback CERN Learning Board (CLB) meetings 4.News from each program 5. Miscellaneous 6.Exchange forum 3 11 March 2013 TEC Meeting
4
DTO-LD Statistics WG (Training Statistics and Reports) 4 11 March 2013 TEC Meeting
5
DTO-LD Statistics WG 5 1.WG met 5 times 2012+2013 2.Mandate (set by WG): Decide on a common standard report for all DTOs (comparable basis) 3.Next steps Conclude on standard set of plots Test new standard HRT report How to include external training in same report 11 March 2013 TEC Meeting
6
DTO-LD Statistics WG 6 Proposals from the WG: DTO reports are extracted with a standard HRT report Equal report criteria for standard report Standard report = default parameters Default: charging date primes over session date Parameters can be modified for any customized report Equal input parameters F.e. any normalization is done with data for Nov 1 of reference period HRT standard report = BO standard report NB New standard HRT report in work (aim @ May/June 2013) Only includes internal training! No cut on session status or participation status applied (CET primes) 11 March 2013 TEC Meeting
7
Proposed set of standard DTO plots I 7 1 2 3 Session dates in 2012 11 March 2013 TEC Meeting
8
Proposed set of standard DTO plots II 8 6 Development of participation / programme This could also be “Development of training days (or cost) / programme Session dates in 2012 11 March 2013 TEC Meeting 5 Average Training Cost / person (normalized) 4 Average Training Days / person (normalized)
9
DTO-LD Tools & Templates WG 9 11 March 2013 TEC Meeting
10
Tools and templates & LNI timeline Extensive internal work in L&D (October to Dec. 2012): Identified different processes involved in the training needs analysis (budget exercise, Departmental POW, MARS, training programmes) and their respective timelines Collected statistics on training requests by population Met with AIS to identify IT tools to support collection of training needs Meeting with DTOs WG (January 15th) Proposal presented by Erwin and Valeria Useful input on how departments deal with these different processes Useful input on drawbacks, concerns from DTOs Meeting CLB (February 25th) Based on new proposal taking into account input from WG Outcome : see later. 10 11 March 2013 TEC Meeting
11
11 DTO-LD Collaboration WG 11 March 2013 TEC Meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.