Download presentation
Presentation is loading. Please wait.
Published byClaude Boone Modified over 8 years ago
1
MIT Building Inspections Cambridge Inspectional Services Craig Bryer EHS- Safety Program
2
Annual Inspections Who? What? Where? When? Why? How?
4
Emergency Egress
9
Exit Signs Lit? Emergency lights? Location?
10
Fire Extinguishers
11
Cambridge Inspectional Services Q & A
12
Inspector Q & A Q: “What is the most important aspect of the MIT building inspection process?” A: “Ensuring emergency egress routes are clear and unobstructed. It is something that is overlooked far too often and should be take much more seriously.”
13
Inspector Q & A Q: “How can MIT improve the most?” A: “The best way is to post floor plans with emergency egress routes for people to familiarize themselves with up and down every building.”
14
Knowledge is Power!
15
Inspector Q & A Q: “Five years from now, you would like to see MIT…” A: “Update existing buildings with new fire doors, panic hardware and exit signage before expanding into new buildings.”
16
Questions/Comments? Thank you! Contact Info: Craig Bryer cbryer@mit.edu 508-561-4225
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.