Presentation is loading. Please wait.

Presentation is loading. Please wait.

Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 The ESPRESSO Control System Echelle SPectrograph for.

Similar presentations


Presentation on theme: "Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 The ESPRESSO Control System Echelle SPectrograph for."— Presentation transcript:

1 Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 The ESPRESSO Control System Echelle SPectrograph for Rocky Exoplanets and Stable Spectral Observations

2 Instrument Control System Seminar, 20 th -24 th October 2014 PI: F. Pepe Co-PI @ INAF-OATs: S. Cristiani; PS @INAF-OATS: P. Molaro  ESPRESSO CS @INAF-OATs: G. Calderone, R. Cirami, P. Di Marcantonio, P. Santin  Coudé Train CS @CAUP: M. Monteiro  ESPRESSO ELE @INAF-OATs: V. Baldini, I. Coretti  Coudé Train ELE @CAAUL: M. Abreu, A. Oliveira  ESPRESSO DAS @INAF-OATs: G. Cupani, V. D’Odorico ESPRESSO Consortium - people Centro de Astrofísica da Universidade do Porto Universidade de Lisboa, CAAUL and LOLS INAF, Osservatorio Astronomico di Trieste INAF, Osservatorio Astronomico di Brera Observatory of the University of Geneva Physics Institute, University of Bern Instituto de Astrofísica de Canarias European Southern Observatory

3 Instrument Control System Seminar, 20 th -24 th October 2014 What kind? Super – UVES (high-resolution, high efficiency) Super – HARPS (ultra stability)

4 Instrument Control System Seminar, 20 th -24 th October 2014 Scientific cases  search for rocky exoplanets in the habitable zone  probe variability of fundamental constants  the chemical composition of stars in local galaxies, IGM etc. etc.

5 Instrument Control System Seminar, 20 th -24 th October 2014 The ESPRESSO Instrument the ESPRESSO movie

6 Instrument Control System Seminar, 20 th -24 th October 2014 Where we are? Somewhere between FDR and PAE … installation in Paranal starting Q1 2016. CCL and CT flange positions/drilling holes

7 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO functions

8 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO “motorized” functions TYPESYMBOLTotal Front End Servo driven rotary motion for ADC (2 for each UT)ROT8 Piezo system for Field stabilization (2-axes)PZT4 Piezo system for Pupil stabilization (2-axes)PZT4 Servo driven rotary motion (filter wheel, neutral density filter)ROT4 Servo driven linear motion (slide), limit switches (calibration injection)LIN4 Servo driven linear motion (slide), limit switches (focus)LIN4 Servo driven rotary motion, proximity switches (mode selector)ROT1 Diagnostic sensors (distributed multi-channel temperature system)SEN1 Electronic cabinet diagnostic sensors (analog and digital)SEN16 + TBD Total F/E29 + sensors Calibration Unit ThAr lampLAM2 Laser Driven Light Source (LDLS)LAM1 Fabry-Pérot (FP)LAM1 Laser Frequency Comb (LFC)LAM1 Servo driven linear motion (lamp selector slide), limit switchesLIN2 Servo driven rotary motion (filter wheel, neutral density filter)ROT2 Servo driven rotary motion (filter wheel, neutral density filter)ROT2 Servo driven linear motion (UT calibration fiber selector slide), limit switches LIN2 Diagnostic sensors (for LFC and other lamps)SENTBD Electronic cabinet diagnostic sensors (analog and digital)SEN4 Total CU14 + sensors Spectrograph Shutter selectorPLC1 Housekeeping system (temperature) - LakeshoresSEN4-218; 3-336 Housekeeping and control system (detector head)SENTBD Housekeeping and control system (vacuum vessel)SENTBD Electronic cabinet diagnostic sensors (analog and digital)SENTBD Total SP1+ sensors

9 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO SW protocols

10 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO deployment diagram

11 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO DFS architecture

12 Instrument Control System Seminar, 20 th -24 th October 2014 SW key-criticalities  control of all functions (specific needs for ESPRESSO e.g. lamps warm-up time, lamps availability, PLC VLT I/f, sensors)  CT control and the multiUT observations  flexibility (possibility to use any of the UT's)  TCCDs deployment (we have 9 of them!) and stabilization performance  DFS (EOPS, DAS deployment)

13 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO CT optics

14 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO CT SW Architecture

15 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO environments

16 Instrument Control System Seminar, 20 th -24 th October 2014 ESPRESSO SW modules

17 Instrument Control System Seminar, 20 th -24 th October 2014 DEMO OS Control

18 Instrument Control System Seminar, 20 th -24 th October 2014 DEMO Status panel – devices

19 Instrument Control System Seminar, 20 th -24 th October 2014 DEMO Status panel – sensors

20 Instrument Control System Seminar, 20 th -24 th October 2014 DEMO ICS Control

21 Instrument Control System Seminar, 20 th -24 th October 2014 DEMO AFPS


Download ppt "Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 The ESPRESSO Control System Echelle SPectrograph for."

Similar presentations


Ads by Google