ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.

Similar presentations


Presentation on theme: "ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN."— Presentation transcript:

1 ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN

2 ZDC partially lifted vertically out of TAN slot

3 ZDC fully lifted out of TAN slot ZDC

4 ZDC lifted – Crane partially rotated toward Sarco on floor

5 Crane rotated nearly over Sarco

6 Crane system aligned and mated with Sarco

7 ZDC partially lowered into Sarco

8 ZDC fully lowered into Sarco – ZDC then removed from crane and taken to storage

9 See ZDC_Crane_Test_Fixture.pdf for dimensions Forbidden volumes of testing fixture – space reserved for ZDC and Crane movements Swivel mount Pivot mount

10

11 Possibly don’t use upper blocks Bolt beam assmbly into lower blocks instead

12

13

14 All-thread and spherical washers


Download ppt "ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN."