1
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN
2
ZDC partially lifted vertically out of TAN slot
3
ZDC fully lifted out of TAN slot ZDC
4
ZDC lifted – Crane partially rotated toward Sarco on floor
5
Crane rotated nearly over Sarco
6
Crane system aligned and mated with Sarco
7
ZDC partially lowered into Sarco
8
ZDC fully lowered into Sarco – ZDC then removed from crane and taken to storage
9
See ZDC_Crane_Test_Fixture.pdf for dimensions Forbidden volumes of testing fixture – space reserved for ZDC and Crane movements Swivel mount Pivot mount
11
Possibly don’t use upper blocks Bolt beam assmbly into lower blocks instead
14