Presentation is loading. Please wait.

Presentation is loading. Please wait.

Terminal Doppler Weather Radar (1-minute SPG products) Mike Istok Radar Improvement Manager NWS Office of Science & Technology 4-5 August 2014 National.

Similar presentations


Presentation on theme: "Terminal Doppler Weather Radar (1-minute SPG products) Mike Istok Radar Improvement Manager NWS Office of Science & Technology 4-5 August 2014 National."— Presentation transcript:

1 Terminal Doppler Weather Radar (1-minute SPG products) Mike Istok Radar Improvement Manager NWS Office of Science & Technology 4-5 August 2014 National Weather Service Partners Meeting Silver Spring, MD 1 8/4/2014 NWS Partners Meeting

2 2 Terminal Doppler Weather Radar (1-minute products) NOAAport & RPCCDS distribution of VCP80 rapid scan update products – 1 minute surface elevation base products – 3 minute storm products and 3 rd elevation base products – Increases since single site max throughput by 2.5X to around 42 kbps TIN 12-13 notified of a test that started April 2012 with 11 radars TIN 13-3 notified that 7 radars were added February 2013 Impact of adding the remaining 27 TDWR sites – Increase peak throughput by 5% Evaluating impacts on affected systems 8/4/2014 NWS Partners Meeting

3 3 Radar Product Central Collection and Dissemination Service (RPCCDS) Status RPCCDS product latency/loss during peak summer hours – Observed when throughput was >133K products/hr and >2.5 G bytes/hour – TOC migrated the RPCCDS to a faster virtual server, but still having problems – Products are now shed when internal backlog queues reach thresholds Loss of products to RPCCDS users and NCDC Archive (up to 20%) Product shedding is a temporary measure to prevent excessive latencies and will be eliminated as soon as the RPCCDS problem is resolved – TOC considering software rewrite – should know more later this month 8/4/2014 NWS Partners Meeting

4 WFO’s providing TDWR SPG Products 8/4/2014 NWS Partners Meeting4

5 5 Current Level 3 Throughput Network Total (156 WSR-88D and 45 TDWR SPG) 8/4/2014 NWS Partners Meeting

6 6 2013 Level 3 Throughput Network Total (156 WSR-88D and 45 TDWR SPG) 8/4/2014 NWS Partners Meeting

7 7 Current Level 3 Throughput Single Site NEXRAD Dual Pol and TDWR SPG 8/4/2014 NWS Partners Meeting

8 8 2013 Level 3 Throughput Single Site NEXRAD Dual Pol and TDWR SPG 8/4/2014 NWS Partners Meeting

9 9


Download ppt "Terminal Doppler Weather Radar (1-minute SPG products) Mike Istok Radar Improvement Manager NWS Office of Science & Technology 4-5 August 2014 National."

Similar presentations


Ads by Google