1
NEW DESIGN BASED ON THE NEW DESIGN PARAMETERS © 2012 INSTITUTE OF TECHNOLOGY PETRONAS SDN BHD All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
2
CASE CHOSEN Case 1: Temperature37oC37oC Pressure 21.85bar Mass Flow Rate 36, 562 kg/h Vapor Fraction 0.196 Oil Produced 1.508 kbpd Gas Produced 6.940 MMSCFD
3
PROCESS FLOW DIAGRAM - FPS (REV 1) (Awaiting our draughtsman to draw the new PFD, it will be attached here)
4
PROCESS FLOW DIAGRAM - COT (REV 1) (Awaiting our draughtsman to draw the new PFD, it will be attached here)
5
PIPELINE DESIGN PIPELINE ROUTE KIMANIS GEMUSUT KAKAP FPS The gas will be sent to the PETRONAS LNG Complex in BINTULU via the Sabah-Sarawak pipeline, for processing and further export or sale.
6
PIPELINE DESIGN ITEMOIL PIPELINEGAS PIPELINE SIZE22 inch18 inch WALL THICKNESS15.88mm12.7mm LENGTH512km MATERIALCarbon Steel RISERSteel Catenary Risers (SCRs) COATINGsyntactic polyurethane (GSPU) Concrete Coating syntactic polyurethane (GSPU) Concrete Coating DESIGN TEMPERATURE 93 0 C Facilities UnitReceiver & Launcher
7
THANK YOU © 2012 INSTITUTE OF TECHNOLOGY PETRONAS SDN BHD All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
8
Back up Slide Pipeline Catenary Riser System
9
Back up Slide Pipeline PIPEFLO Screenshot