Catania Production Center S.Albergo Universita’ & INFN Catania
2
S.Albergo - Bonding Meeting 9/12/2003 Responsibility microbonding of ~ 500 TIB/TID modules qualification and L.T. test of 500 modules Participation to module assembly in Bari
3
S.Albergo - Bonding Meeting 9/12/2003 ARC Optical inspection ARC Vienna box CMSCMS HughesHughes HughesHughes storagestorage storagestorage Pull test ALICE AREA
4
S.Albergo - Bonding Meeting 9/12/2003 ARC & Long Term Test Two ARC Systems installed and working Full test: ped, noise, calib, led, pinhole o Affolder macro running Long Term set-up with 6 modules: 50 hour cicle 20° -20° 20° OK Multiplexer and Electrometer OK CMN ≤ 0.4
5
S.Albergo - Bonding Meeting 9/12/2003 Long Term
6
S.Albergo - Bonding Meeting 9/12/2003 Long Term - pedestals
7
S.Albergo - Bonding Meeting 9/12/2003 Long Term – CMN & IV
8
S.Albergo - Bonding Meeting 9/12/2003 People & tasks Optical inspection C.Tuv è + M.Salemi (50%) Micro-bonding S.Costa + N.Giudice (50%) & pull test Database S.Costa ARC test A.Tricomi + M.Chiorboli+ C.Tuv è + S.Costa & thermal cycle Long Term test A.Tricomi + M.Chiorboli + N.Guardone(50%) Center coordination S.Albergo