Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.

Similar presentations


Presentation on theme: "Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1."— Presentation transcript:

1 Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1

2 Agenda Completed Construction Projects District Wide – Monument Signs LAC South Walkway Extension LAC Infrastructure Improvements Project and District Wide – Energy Efficiency Project LAC W Trailers Demo PCC Tech 1 (Sheet Metal) Current Construction Projects LAC Building A – Student Services Retrofit LAC Building I (Bookstore) LAC Master Landscape LAC Stadium Parking Lot Lights and Veterans Stadium Lights PCC MDAB (Multi-Disciplinary Academic Building) Upcoming Construction Projects LAC PCC Building CC Retrofit LAC Math Technology Building PCC Building GG LAC Building C Retrofit Q & A 2

3 Completed Construction Projects District Wide – Monument Signs Measure E 2008 Measure E 2008 3 District Wide Monument Signs. Locations:  LAC-Clark/Conant  PCC-20 th /Walnut Ave. LAC Bldg. Designator LAC Monument Sign PCC Monument Sign

4 Completed Construction Projects LAC South Walkway Extension Measure E 2008 Measure E 2008 4 Project complete Palm trees to be replaced August 2011 Continues Master Plan pedestrian corridor

5 5 LAC Infrastructure Improvement Project and District Wide Energy Efficiency Project Measure E 2008 Completed Construction Projects Total annual estimated savings of 1.5 mil. Kwh Project started Fall 2009; currently hydro seeding all affected areas(All phases) Majority of existing building HVAC systems to be upgraded and connected to the Central Plant Buildings B,C,D,E,G, & H are connected Exterior lighting and controls upgrades All parking lots north of Lew Davis are on new system New Reclaimed Water tie-ins to irrigation connected New gas lines installed for Buildings B, C, D, E, G, H, J, M, N, and P New domestic lines installed for Buildings B, C, D, E, F, G, H, I Trailers, J, K,L, M, N, P Construction completed Summer 2011

6 Completed Construction Projects 6 Project addresses storm run off issues with bio swales Site converted to a parking lot Project completed Summer 2011 LAC W Trailers Demo - Measure E 2008

7 Completed Construction Projects 7 Construction started Summer 2011 Equipment and utilities installed Projected completed before start of Fall semester 2011 PCC Tech 1 (Sheet Metal) - Measure E 2008

8 Current Construction Projects LAC Building A – Student Services Retrofit Measure E 2008 8 New home for A&R, Counseling, Health Services, Cashier, Transfer Center Project currently in structural upgrade End of construction anticipated Summer 2012

9 Current Construction Projects 9 Adds additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme Work on framing and utilities underway End of Construction anticipated Fall 2011 Move in planned for late January or early Feburary LAC Building I - Measure E 2008

10 Current Construction Projects 10 Currently in Design Phase(Finalizing design) Plans to be submitted to DSA in August Quad areas North and South of Bldg. A will bid Fall 2011 Remaining areas designed at 25% Scope includes new hardscape/landscape and pedestrian pathways LAC Master Landscape - Measure E 2008

11 Current Construction Projects PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2008 11 MDAB building remodel project Phase 1 of 2 currently under construction Project currently in demolition and structural reinforcement Phase 1 Project to be completed Summer 2012

12 12 Stadium Parking Lot Lights and Stadium Lighting Measure E 2008 Current Construction Projects Stadium parking lot lights Construction commenced 9/12 Work will start in South East portion of parking lot Install energy efficient lights with controls capabilities Stadium lighting retrofit Awaiting final DSA approval

13 Upcoming Construction Projects PCC Building CC Retrofit - Measure E 2008 13 Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices Swing space located on PCC Campus (Bldg. GG) Approved by DSA on 1/27/11. Currently in bid process To be completed concurrently with MDAB project phase 1 Anticipated end of construction Fall 2012

14 Upcoming Construction Projects Will house Math and Culinary Arts instructional program as well as Reprographics Design Build delivery method Requesting Qualifications (RFQ) – Due 8/3 Shortlisted and interviewed 10 respondents (9/7-9/9) Select 3 and request for proposals Anticipated start of construction 2013 LAC Math Technology Building – Measure E 2008 14

15 Upcoming Construction Projects PCC Building GG - Measure E 2008 15 Design Build delivery method Request for Qualifications (RFQ) Start in September and due late October Building to house Health Services, EOPS, DSPS, Financial Aid, Cashier, A&R, and Counseling Estimated start of construction December 2013

16 Upcoming Construction Projects LAC Building C Retrofit - Measure E 2008 16 Hired Architect to do design work Currently in schematic phase Work includes modernization of structure, classrooms spaces, and office areas

17 l i b e r a l a r t s Liberal Arts Campus Site Plan

18 p a c i f i c c o a s t Pacific Coast Campus Site Plan

19 QUESTIONS & ANSWERS EDUCATE  ENGAGE  EMPOWER 19