TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão
2
General Planning TIDVG2014 Upper Yoke Core Lower Yoke Graphite Aluminium Copper Tungsten Necessary operations to produce the TIDVG2014: Prepare spare yokes Disassemble TIDVG2004 (radioactive) and remove old core. Prepare new core Finalize the bake-out and place temperature sensors. Assemble and test TIDVG2014 (alignment survey + water leak test). Remove TIDVG2013 (damaged TIDVG presently installed in BA1 - SPS). Install, test and bake-out the new TIDVG2014. OK Ongoing To be completed
3
Completed Tasks Disassembly of the TIDVG2004 (EN/STI, HE/HH & DGS/RP) OK Bldg. 954
4
On-Going Operations Core Bake-out (TE-VSC) Temperature Sensors Preparation for TIDVG2014 (EN/STI) Housing for water temperature sensors Core temperature sensors Bldg. 887 (EHN1) Core Ongoing
5
Operations for Next Weeks Week 21-25/07: Temperature sensors preparation until end of the week. In worst case, bake-out should finish Friday, 25/08. Week 28/07 – 01/08: Installation of the PT100’s on the core & transport to Bldg. 954. Assembly of the TIDVG2014 & water leak test. Following weeks: Alignment survey Acceptance of TIDVG2014 (Project milestone!) Removal of TIDVG2013 Installation of TIDVG2014
6
THANK YOU 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão