NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.

Similar presentations


Presentation on theme: "NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP."— Presentation transcript:

1 NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.

2 NEXT BEAMS  Quantity ~ 6 beams  Length ~ 67 ‘  Width ~ 8’  Weight ~ 82,422 lb E.T.& L. CORP.

3  Minimal deck formwork  Ease of erection  Reduced construction time  Increased jobsite safety E.T.& L. CORP.

4  Weight of Beams  Two Cranes  Unloading Area E.T.& L. CORP.

5  Beam camber movement during concrete deck placement  Minimal adjustment for top of final deck elevation E.T.& L. CORP.

6  Concrete clearance  6” Stirrups  Overhang bracket clips  Bidwell Setup E.T.& L. CORP.

7 QUESTIONS / COMMENTS E.T.& L. CORP.