Download presentation
Presentation is loading. Please wait.
Published byMarshall Harmon Modified over 8 years ago
1
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 Wind Power Risk Contracts Albert.Klein.Tank@KNMI.nl
2
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 Agenda Station wind data on Internet Interpolation to other locations Wind energy services For tomorrow
3
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 Station wind data on Internet Climate proofing the Netherlands: revisiting the DELTA works Hourly wind series primary input for design of dikes All data provided on the Internet
4
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 Station wind data on Internet Climate proofing the Netherlands: revisiting the DELTA works Hourly wind series primary input for design of dikes All data provided on the Internet
5
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 Interpolation
6
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007
9
Wind energy services
10
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 (www.knmi.nl) Summer precip ~2050 Number of windstorms > 7 Bft For tomorrow
11
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 “Extra-tropical storm tracks are projected to move poleward, continuing the broad pattern of observed trends over the last half-century” IPCC-AR4 consequent changes in local wind conditions!
12
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 Projections for NL …but natural variability is still large compared to the local change signal (KNMI, 2006)
13
WRMA-WMO-World Bank-WFP Expert Meeting, Geneva, Dec. 2007 (KNMI, 2006) Other projections for NL
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.