1 17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and maintenance services

2 17 th November 20062M. Battistin On call and maintenance services costs (1) Spare part management and costs document is under construction now (2) Any R&D phase shall be financed on top of it

3 17 th November 20063M. Battistin Works advancement The stand-by duty service has been ready to start since September 2006

4 17 th November 20064M. Battistin Stand-by duty service is ready to start Framework: M&O agreement EDMS 658953 Internal procedure: EDMS 783428 Internal training executed on all the cooling station in operation Stand-by duty intervention 162400 + detector-cooling@cern.chdetector-cooling@cern.ch Connection to DSS or DCS of the experiment ATLAS asked to start the service now

5 17 th November 20065M. Battistin Back-up

6 17 th November 20066M. Battistin A dedicated team will assure the service ½ section leader 1 engineer 1 fridge expert 1 electrical & control expert 1 pipe welder 1 technician (purchase, CAMMS, store) financed by TS LS on cost refund Staff funded by CERN-Experiment Agreement (Jul ’08) Cost related to manpower refund increases as the CERN-experiment agreement will phase out in the next years

7 17 th November 20067M. Battistin Maintenance cost 2.67% of the installation value gives minimum reference for maintenance cost estimation Installation value gives sharing criteria ½ manpower - ½ material (contractor interventions) - assumed Major spare parts (pumps, compressors, etc.) shall be considered “on top” of these amounts.