1 All Experimenters’ Meeting September 23, 2013

2

3 Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB Weekly Integrated Intensity 0.0 protons NMuon Weekly Integrated Intensity 0.0 protons MTest Weekly Integrated Intensity 4.17 E12 protons Beam Hours To NuMI 113.3 hours Beam Hours To MTest 72.9 hours From : September 16, 2013 (0000 hours) To: September 23, 2013 (0000 hours)

4

5 Status /Work Completed/Plans Proton Source – Tuning & Studies – Maintenance during downtime – Replaced PA for LRF4 – Booster kickers Main Injector – Accesses Tuesday (2 hr) & Thursday (day shift) Ground fault in MI – Nothing found – 10 k Ω /ground Wednesday – 700k Ω /ground Thursday Sump pump float and check valve – Beam to Switchyard & MTest Tuning – Recycler Beam Studies Alignment work Investigated aperture restriction NuMI – Running and tuning Switchyard – Worked on MSEP – Worked on extraction and beamline tuning MTest – New experiments taking beam NMuon – Alignment mapping – Horizontal Optical Scans – Installing magnets and connecting instrumentation

6 Schedules and Links: Schedule can be accessed from the Operations Home Page – - Schedules -> Operations ScheduleOperations Schedule Direct link to schedule – - http://www-ad.fnal.gov/ops/schedule.htmlhttp://www-ad.fnal.gov/ops/schedule.html

7 MI Ground Fault Ground fault isolated to the buss penetration from the MI60 south power supply to the tunnel Wednesday evening it was reading ~10KΩ/Ground Thursday Morning it was reading ~ 700KΩ/Ground. With the remainder of the buss connected (MI60- MI50) the lower buss was reading ~500KΩ/Ground, not good but OK to run Buss penetrations covers were removed for inspection Thursday but nothing was found