04 th Sept 2012 Competitor Survey ~ Loading Bay Condition (Series 1) ~ 18 th Aug 2012.

Similar presentations


Presentation on theme: "04 th Sept 2012 Competitor Survey ~ Loading Bay Condition (Series 1) ~ 18 th Aug 2012."— Presentation transcript:

1 04 th Sept 2012 Competitor Survey ~ Loading Bay Condition (Series 1) ~ 18 th Aug 2012

2 1 Competitor Survey – Loading Bay

3 2 Display for supplier waiting area consists of Supplier Name & Time Benches for supplier waiting at centralized area Security: Cage/shuttle closed at all the time

4 3 Competitor Survey – Loading Bay Delivery Material: Properly stacked by type

5 4 Competitor Survey – Loading Bay Security: Post located at the entrance & exit of loading bay Security: Gate allocated at entrance & exit of loading bay

6 5 Competitor Survey – Loading Bay Delivery Material: Properly stacked according to type

7 6 Competitor Survey – Loading Bay Security: They increased the wall’s height of the loading bay compound Security: Thorn steel bush were installed Security: Covered from outside sight

8 7 Competitor Survey – Loading Bay Security: Dry fuse area are outside of loading bay compound Security: Closed at all the time. Staffs throws rubbish from inside Security: Contractor covers the fuse container during transit

9 -This slide ends here – ありがとう THE END 8


Download ppt "04 th Sept 2012 Competitor Survey ~ Loading Bay Condition (Series 1) ~ 18 th Aug 2012."