04 th Sept 2012 Competitor Survey ~ Loading Bay Condition (Series 1) ~ 18 th Aug 2012
2
1 Competitor Survey – Loading Bay
3
2 Display for supplier waiting area consists of Supplier Name & Time Benches for supplier waiting at centralized area Security: Cage/shuttle closed at all the time
4
3 Competitor Survey – Loading Bay Delivery Material: Properly stacked by type
5
4 Competitor Survey – Loading Bay Security: Post located at the entrance & exit of loading bay Security: Gate allocated at entrance & exit of loading bay
6
5 Competitor Survey – Loading Bay Delivery Material: Properly stacked according to type
7
6 Competitor Survey – Loading Bay Security: They increased the wall’s height of the loading bay compound Security: Thorn steel bush were installed Security: Covered from outside sight
8
7 Competitor Survey – Loading Bay Security: Dry fuse area are outside of loading bay compound Security: Closed at all the time. Staffs throws rubbish from inside Security: Contractor covers the fuse container during transit