Hall A Target Gmp Meeting Sept 24, 2012
2
General Goal to Make A and C Identical Give option for complete target swap in crisis Allow fewer total spare components o Gives more total components for crisis events Easier maintenance Allow faster install/removal times All mods will have to meet 10 CFR 851 requirements.
3
General Maintenance Replace all safety reliefs with ASME valves. Upgrade CAD models. Replace lifter motion control system with updated controler. Replace/rebuild all fan motors Replace all temperature sensors Replace all wiring o Internal wiring upgrade to thicker wire o external cable connections same for each hall
4
Upgrades Remove solenoid valves from gas panel Remove VPT pump/purge panel. Replace all loop plumbing o New drawings o New hose sections o New heater sections (tees with feethrus) New heaters o Heater/supplies will be same as Hall C o New heaters will be in loop New loops will be consistent with Hall C
5
Current Request 10/15 cm cells o Use standard CF style cells 3 loops LH2 Standard Optics Target Standard Dummy target Standard solid target ladder o 5 positions o Empty Compatible with DVCS Special pointing target is acceptable but must be interlocked to target motion
7
Summary Gmp has reasonable and standard requirements Work on target for Hall A is in progress All requests so far have been for standard equipment See no problems with schedule or requests