Download presentation
Presentation is loading. Please wait.
Published byAubrey Fitzgerald Modified over 8 years ago
1
Orlando-Orange County Expressway Authority Update L.A. Griffin Manager of Expressway Operations March 20, 2008
2
Expressway Operations Squad Patrols 6 am – 10 pm, 7 days a week Evaluating Current Staffing Levels Meet target response times and maximize productivity Florida Highway Patrol (FHP)
3
Road Ranger Motorist Assistance Service Patrol Joint Project with Florida’s Turnpike Enterprise Original Contract: Sept. 2001 138,997 Assists thru Sept. 14, 2007 New Contract: Sept. 15, 2007 2622 Assists in Jan-08 13,092 Assists thru Jan-08
4
Road Ranger Motorist Assistance Service Patrol APL Approved DMS AVL / Electronic Logging
5
Online: Video System 144 Closed Circuit Television Cameras Viewed at OOCEA facilities & FDOT District 5 RTMC Multicasting OOCEA video to FDOT Receiving FDOT multicast video Reciprocal control of video TV Stations are Broadcasting
6
Online: Travel Time Information 97 Data Collection Sensors Read transponders to determine travel times Data Server Travel Time Software Feeds OOCEA DMS, FDOT 511 Feb-08 Uptime: 99.93%
7
Dynamic Message Signs (DMS) 35 Dynamic Message Signs 19 operational Feb-08 Message Uptime: 94.5% 16 under construction SR 520 South of SR 528 (FDOT ROW) SR 417 North of SR 408
8
Performance Monitoring Monthly Reporting Operational Indicators Candidate Outcome Measures Travel Times: Free Flow, Average, 95% Reliable, Thresholds Travel Time Indices % of Peak Period with Congestion Before/After Analysis SR 408 Widening impact
9
Upcoming Project I-4 / SR 408 Interchange SR 408 Core Project (599-503) 7 new and 6 relocated CCTV cameras 19 new and 1 relocated Data Collection Sensor Sites 38 sites converted to field Gigabit Ethernet Switches Bidding: Summer, 2008
10
Thank You!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.