1 Corridor Management Plan

2 Nine Mile Road – Northern Project Limit Pensacola Blvd. (US 29) – Southern Project Limit 4.8 Miles Long 8 Signalized Intersections Urban Collector 2 Lane Undivided Section

3 Public Involvement Data Collection Capacity Analysis Crash Analysis Access Management Assessment Proposed Improvements Submittal of Draft Plan

4 Bridge Over I-10 Few Transit Amenities Lack of Pedestrian/Bicycle Features Access Management Concerns

5 Combination Bicycle/Pedestrian Lane Combination Buffered Bicycle/Pedestrian Lane Bike Lane with Separated Sidewalk Median with Turn Lanes, Sidewalk and Bike Lanes Median with Turn Lanes, Sidewalk and Sharrows

6 Proposed Typical Section Concept

7 Proposed Typical Section Rendering

8 Potential Roundabouts at 2 Locations (Ensley Street and Stumpfield Road/Majors Road/Industrial Boulevard) Road Diet –Intersection of Airport Road Development of a Corridor Framework Analysis Plan Transit Stop Enhancements/Modifications Proposed Modification of I-10 Overpass as part of the I-10/US 29 Interchange Improvements

9 Philip Shad – Atkins phil.shad@atkinsglobal.com Brian Youpatoff – TPO brian.youpatoff@wfrpc.org