Presentation is loading. Please wait.

Presentation is loading. Please wait.

63rd IETF Paris August 2005 CCAMP Working Group Online Agenda and Slides at:

Similar presentations


Presentation on theme: "63rd IETF Paris August 2005 CCAMP Working Group Online Agenda and Slides at:"— Presentation transcript:

1 63rd IETF Paris August 2005 CCAMP Working Group Online Agenda and Slides at: http://www.olddog.co.uk/63/ccamp.htm

2 63rd IETF Paris August 2005 Agenda (1 of 2) Administrivia (10 mins) Adrian & Kireeti Status of WG (5 mins) Adrian & Kireeti ITU-T Liaison report (10 mins) Lyndon WG drafts Status and Plans –Inter-domain Stitching (5 mins) draft-ietf-ccamp-lsp-stitching-01.txt Arthi Inter-domain Signaling (5 mins) draft-ietf-ccamp-inter-domain-rsvp-te-00.txt Arthi Per-Domain-Path-Computation (5 mins) draft-ietf-ccamp-inter-domain-pd-path-comp-00.txt JP –GMPLS Addressing (10 mins) draft-ietf-ccamp-gmpls-addressing-01.txt Richard –ASON/GMPLS Lexicography (10 mins) draft-ietf-ccamp-gmpls-ason-lexicography-03.txt Igor –ASON routing evaluation (5 mins) draft-ietf-ccamp-gmpls-ason-routing-eval-01.txt Dimitri –ASON signaling (5 mins) draft-ietf-ccamp-gmpls-rsvp-te-ason-03.txt Dimitri

3 63rd IETF Paris August 2005 Agenda (2 of 2) Working Group Work Plan –Options for progress (5 mins) Adrian and Kireeti –Potential new work (15 mins) Adrian and Kireeti –Charter discussion (15 mins) Alex, Bill, Adrian and Kireeti Layer Two Switching –Framework (10 mins) draft-papadimitriou-ccamp-gmpls-ethernet-framework-00.txt Dimitri –Next steps (10 minutes) Adrian and Kireeti Other drafts –Advertising node TE capabilities (5 mins) draft-vasseur-ccamp-te-node-cap draft-vasseur-ccamp-automesh JP –Advanced constraints draft-otani-ccamp-gmpls-cspf-constraints (5 mins) Tomohiro draft-ashwood-ccamp-gmpls-constraint-reqts-00.txt (5 mins) Don –VCAT/LCAS draft-bernstein-ccamp-gmpls-vcat-lcas-00.txt (5 mins) Greg draft-imajuku-ccamp-gmpls-vcat-lagr-req-00.txt (5 mins) Wataru

4 63rd IETF Paris August 2005 Draft Status – Beyond the Working Group One new RFC –RFC 4139 –Requirements for Generalized MPLS (GMPLS) Signaling Usage and Extensions for Automatically Switched Optical Network (ASON) Thirteen drafts in the RFC Editor’s Queue –Increase of two since last time –Not one is blocked by a reference – just waiting for the Editor Eight drafts with AD for review –Increase of six since last time Three drafts waiting for MIB Doctor review –Increase in three since last time

5 63rd IETF Paris August 2005 Draft Status – Still with the Working Group Completed WG last call on eight drafts Nine active Working Group draft remain –Six new WG drafts since last time GMPLS Addressing GMPLS ASON Lexicography ASON Routing Evaluation LSP Stitching Inter-domain RSVP-TE Per-domain Path Computation –Two marked up after WG last call need chair’s sign-off RSVP Restart Extensions RSVP Exclude Route –One draft still active from before ASON Signaling Individual status reports will show that most drafts are cooked.

6 63rd IETF Paris August 2005 Charter Milestones MIB milestone completed since last time. One milestone remains Mar 04Submit revised charter and milestones to IESG for IESG consideration of more detailed deliverables and determination of usefulness of continuation of WG Full discussion later in this meeting


Download ppt "63rd IETF Paris August 2005 CCAMP Working Group Online Agenda and Slides at:"

Similar presentations


Ads by Google