Download presentation
Presentation is loading. Please wait.
Published byUrsula Short Modified over 8 years ago
1
Draft FAR Changes Part of a Quality Team Report
2
Draft FAR Changes LEGEND. Above the FAR text, a legend shows the date of the team report, type of rule, the Federal Acquisition Circular (FAC) upon which it was baselined, and how the line-in-line-out changes are marked.
3
Draft FAR Changes COMMERCIAL ITEMS, COTS ITEMS, BELOW SAT. – Any necessary changes to 12.503 through 12.505 (if a statute does not apply to commercial items); – 12.301(d) (if a clause that applies to commercial items is not required by statute or Executive order) – 52.212-5, 52.213-4, and 52.244-6) (if it applies to commercial items or below the SAT) ;
4
Draft FAR Changes SAM. If the draft rule contains a representation or certification that will be included in SAM, the appropriate changes have been made to 4.1202 and 52.204-8, and for commercial items 52.212-3. CROSS-REFERENCES. A search has been run through the FAR for the section and paragraph numbers being changed, to catch cross-references which need updating. OMB CLEARANCE NUMBER. If there is a new Paperwork Burden OMB clearance number, it has been added to the list at 1.106.
5
If the rule follows the receipt of public comments… BASELINE FOR FINAL RULE. The Word documents for the proposed or interim rule have been updated to show the FRN version as actually published in the Federal Register. HEADING. The documents have been further updated to show this is now a final rule.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.