Biomass CHP TŘEBÍČI Czech Republic
2
Historie projektu 12/2000 - boiler house K13
3
Historie projektu 10/2001 – Gas-fired boilers 2 x 5 MWt
4
Historie projektu Total capacity 10 MWt Total capacity 0 MWe 5MW Vjezd do areálu
5
Historie projektu 01/2002 – Biomass boiler, Vesko-B 3,0 MW
6
Historie projektu biomass boiler house 01/2002
7
Historie projektu Total capacity 13 MWt Total capacity 0 MWe 5MW Vjezd do areálu 3MW
8
Historie projektu 01/2002 – Gas-fired CHP steam boiler TEDOM 140 a TEDOM 132
9
Historie projektu Total capacity 13,4 MWt Total capacity 0,27 MWe 5MW Vjezd do areálu 3MW MT 140 MT 132
10
Historie projektu 10/2004 – Gas-fired boilers 2 x 6 MW
11
Historie projektu Total capacity 25,4 MWt Total capacity 0,27 MWe 5MW Vjezd do areálu 3MW 6MW MT 140 MT 132
12
Historie projektu 01/2005 – Biomass boiler 7 MWt (including ORC)
13
Historie projektu Ash container Fuel storage
14
Historie projektu 02/2005 – Chimney biomass boiler
15
Historie projektu 04/2005 - ORC turbíne 1 MWe
16
Historie projektu 05/2005 – Heat exchanger 1800 m 3 for thermal oil
17
Historie projektu Total capacity 32,4 MWt Total capacity 1,27 MWe 5MW Vjezd do areálu 3MW 6MW MT 140 MT 132 ORC 1 MW 7MW
18
Historie projektu 05/2005 – creation of information centre
19
Historie projektu 02/2007 – biomass straw boiler 5 MW
20
Historie projektu straw handling
21
Historie projektu Total capacity 37,4 MWt Total capacity 1,27 MWe 5MW Vjezd do areálu 3MW 6MW MT 140 MT 132 ORC 1 MW 7MW 5MW
22
Historie projektu - overview 04/2005 - installation ORC turbíne 1 MWe 05/2005 – information centre 12/2000 – brown coal boiler K13 10/2004 - gas-fired boilers 2 x 6 MWt 01/2005 – biomass boiler 7 MWt (including ORC) 01/2002 – gas-fired CHP boilers TEDOM 140, TEDOM 132 01/2002 – biomass boiler 3 MWt 10/2001 – gas-fired boilers 2 x 5 MWt 02/2007 – straw boiler 5 MWt 06/2005 – official opening ORC 05/2005 – heat exchanger 1800 m3
23
Biomass used Sawdust Bark Chips Straw
25
Reduction CO 2 Rok Replacement gas Avoided CH4 Emission forest Reduction due to power production Total CO 2 reduction 2001 0 000 20021 85032402 174 20032 25539502 650 20043 42159804 019 20057 2171 2642 57911 060 200610 4271 8253 72615 978
27
Increased biomass usage
28
Next steps 08/2007 – straw boiler VESKO-S 5,0 MW – Reconstruction South plant in Trebici To be continued
29
Next presentation Best practice - CHP