Download presentation
Presentation is loading. Please wait.
Published byClaire Freeman Modified over 9 years ago
1
TRAFFIC HUB PROJECT
2
1. Interchange of SADC traffic 2. Saving in Bandwidth and Cost 3. Speed and Quality of service
3
1. Identification of the technology and solutions for establishing hub 2. Similar initiatives being done in the region 3. Location of the SADC Traffic Hub eg Data Centers (Teraco and Cable landing Stations)
4
4. Identify the equipment and connectivity required for IPX 5. Funding for the procurement of the equipment 6. Identify the Management Team of the SADC 5. 6. Traffic Hub/funding
5
7.Procurement and Installation of the equipment 8.Maintenance of the Traffic Hub 9.Addition of new members/operators
6
THANK YOU
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.