Download presentation
Presentation is loading. Please wait.
Published bySara McBride Modified over 9 years ago
1
90% PLAN APPROVAL
2
Presentation Outline Board Direction 90% Plan Modifications Cost Estimates Project Timeline Recommendation
3
Board Direction Approved motion from August 2009 –Approve the revised 60% plans as presented and direct staff to proceed with 90% plan development with the following changes: 1.From Station 86+50 to Station 87+60 follow the original path 2. Look in front of Cobblefield and determine how wide the additional asphalt is past the markings on the pavement.
4
Typical Cross Section 2’ PAVED SHOULDER VARIES 8’ 20’ VARIES 66’-100’ 2’ CURB & GUTTER
5
Multi-use Path Relocation Relocated path back to original alignment
6
Cobblefield Entrance
7
Landscaping
8
Proposed Understory Trees
9
Landscaping
10
Estimated Costs Resurfacing$772,000 Paved shoulder$28,000 Multi-use path$85,000 Landscaping$13,000 Total$898,000
11
Project Timeline 90% plan approval by BoCC Bid award and contract approval by BoCC
12
Recommendation Approve the 90% design plans as presented and direct staff to finalize the plans and proceed to the bid phase.
13
Questions ?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.