90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.

Similar presentations


Presentation on theme: "90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation."— Presentation transcript:

1 90% PLAN APPROVAL

2 Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation

3 Board Direction  Approved motion from August 2009 –Approve the revised 60% plans as presented and direct staff to proceed with 90% plan development with the following changes: 1.From Station 86+50 to Station 87+60 follow the original path 2. Look in front of Cobblefield and determine how wide the additional asphalt is past the markings on the pavement.

4 Typical Cross Section 2’ PAVED SHOULDER VARIES 8’ 20’ VARIES 66’-100’ 2’ CURB & GUTTER

5 Multi-use Path Relocation Relocated path back to original alignment

6 Cobblefield Entrance

7 Landscaping

8 Proposed Understory Trees

9 Landscaping

10 Estimated Costs Resurfacing$772,000 Paved shoulder$28,000 Multi-use path$85,000 Landscaping$13,000 Total$898,000

11 Project Timeline 90% plan approval by BoCC Bid award and contract approval by BoCC

12 Recommendation  Approve the 90% design plans as presented and direct staff to finalize the plans and proceed to the bid phase.

13 Questions ?