Download presentation
Presentation is loading. Please wait.
Published byWillis Hampton Modified over 9 years ago
1
LV & HV Updates Vasileios Martos
2
Start / Stop GapsCheck Script Instead of using Browser or the Console Manager to Start/Stop The Script.
3
Start / Stop GapsCheck Script You can use the ON / OFF buttons from the main HV panel
4
Start / Stop GapsCheck Script Another indication in HV Monitoring Windows
5
Matsusada Control Ramping Up / Down Matsusada Through a panel.
6
Matsusada Control Ramping Up / Down Matsusada Through panel.
7
Matsusada Control Ramping Up / Down Matsusada Through panel.
8
Matsusada Control For: Vset > 3000 V RampSpeed > 50 V/s Use the manual procedure through the linux console
9
Matsusada Control In a normal Ramp you should receive those messages. 2507 V
10
Matsusada Control In Case of error “Unable to Open Port” You should use linux console to kill a matsusada ramp up/down process.
11
Other Updates / comments Minor updates in LV project: Trends/histogram in Sense Voltage and Current Values** Add of Close buttons in some panels. Major update in HV project: Clara update the FSM and fixed the bug of the R4.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.