1 What has been done Campaigns of insertion: 2 in Legnaro, 1 in GSI but few are not yet in the DataBase =>300 objects referenced and assembled but few are not yet in the DataBase Production and distribution of barcode sheets in the production centers Development: more functionalities in the GUI example: possibility to display a photo of an object

2 Some objects contained in the DB

3 Example of barcodes: the LVPS

4 Photos AGATA =>SOON: a new version of the GUI

5 Work to continue Insertion of new objects: in the production centers, barcodes to be stuck and registered in the DB Functionality of transfer to use: -emails are sent automatically -at reception, objects in the box belong to the new center by a single scan of the barcode of the transfer

6 Transfers list

7 Edition of a specific transfer and verification of objects contained in the transfer

8 Work to continue Insertion of new objects Functionality of transfer to use Assembly of objects: for instance – Electronic: which mezzanine in which carrier =>important for Topology Manager – Detector: which capsule in which Cluster =>important for PSA (base of signals)

9 Composition of a carrier

10 Composition of a Triple Cluster

11 Work to continue Insertion of new objects Functionality of transfer to use Assembly of objects Actions: – Insertion of measures in the DB: ex the CAT of a crystal – Insertion of informations on objects: ex action owner on a capsule

12 Resolution of a crystal

13 Crosstalk of a crystal

14 Action owner on a capsule

15 Work to continue Insertion of new objects Functionality of transfer to use Assembly of objects Actions Objects broken/repaired: to be registered in the DB =>Role of the contact persons: update the DB and transmit the informations to be as close as possible to the reality

16 Informations Documentation: with useful video tutorials http://agata.in2p3.fr/DB/Home.html For any questions/comments, don’t hesitate: => a unique email: agatadb@ipnl.in2p3.fragatadb@ipnl.in2p3.fr Connections between objects to define and implement Synchronization with the Topology Manager in progress (interaction with DAQ group)

17 Example of connections