EMu Slice Test -- Status Frank Geurts FNAL/Rice http://cern.ch/EmuSliceTest
2
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 2 Objectives Hook-up CSCs to Peripheral Crates use final electronics, as much as possible revert to Beam-Test solutions whenever needed Hook up Peripheral Crates to Trigger and DAQ use TrackFinder for self-trigger use EMu-FED and Central-DAQ Establish and finalize procedures and software timing and calibration procedures test methods (shared with 904 crew) software integration Prepare towards the CMS Magnet Test Cosmic Challenge with CMS-wide slice can we deliver a 60° sector, i.e. 39 CSCs?
3
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 3 March Test “A journey of more than 468 chambers starts with a first CSC” Connect & Configure 6 CSCs on YE+2: 3 ME+2 and 3 ME+3 chambers HV + LV + gas Self-trigger on cosmics provide MPC data to TF get trigger back from TTC Provide S-Link data to Central-DAQ and spy data to DQM
4
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 4 Current Status -1- two chambers ME+2/1/16 ME+3/1/16 part of HV long term test gas and LV are connected 27 32 16 27 14 32 16 ME2 ME3
5
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 5 Current Status -2- Peripheral Crate “old school” 6U backplane standard Wiener crate Dynatem D360 2 pairs of DMB/TMB TMB2004, w/o RAT DMB production board CCB + MPC DDU (temporary)
6
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 6 Peripheral Crate ME3/1/16 ME2/1/16 DDU (temp.) CCB MPC “oil, grease & dust cover” dynatem D360
7
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 7 Current Status -3- External Rack “mini counting house” Control & DAQ pc remotely accessible protected by UPS Network power switch ordered allow remote power-cycling of Peripheral Crate temporary location for TF and TTC crates awaiting rack allocation in counting house and fiber installation welding equipment External Rack
8
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 8 March Spring Test March test: provide data from up to 6 chambers to Central-DAQ. However, need the fiber duct/mini-tube option installed lead time of various patch cords ~1 month YE+2 will move to a new position ~March 15 as soon as provisional wall removal has finished this is a 15m (!!) journey serious impact on distribution of gas and other utilities none of which are available at that location Availability of FED electronics & experts OSU preference for 2 nd half of April Spring starts at March 21 st …
9
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 9 New YE+2 position ~15m
10
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 10 Wall Removal Has Started … PX56 sideSX5 side lots of dust lots of electronic s dd. Feb. 23, 2005
11
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 11 Wall Removal … At the moment, convection keeps dust out; but what happens when the complete wall has disappeared? No measures yet to prevent dust from getting in. effect on chambers, electronics, fibers, computers, …? SX5-wide solutions: large plastic curtains? EMU-only solution
12
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 12 Short term plans Chamber timing use test tools with (remote) help from TMB and DMB experts CSC trigger procure TTC modules Local DAQ Add up to 4 large chambers: ME 2/2/31-32 and ME3/2/31-32 Switch to Counting House whenever possible fibers need to be installed TF, TTC and (pseudo † ) FED crate in EMU racks rack allocation, however, still unknown † pseudo = old DDU/CCB in peripheral mini-crate
13
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 13 Spring Test A 20° sector of ME2 and ME3 chambers one peripheral crate with 6 chambers timed in Self-trigger using TrackFinder EMuDAQ to CentralDAQ via S-Link all of which in the Counting House Spring Configuration: ME{2,3}/1/16 + ME{2,3}/2/31-32 27 14 32 16 ME2 27 14 32 16 ME3
14
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 14 Mid-term Plans Replace electronics with final versions as much as possible CSC LV, CSC HV, Peripheral Crate Backplane, CRB (LV+cooling), TMB (RAT), Crate Controller, DDU, DCC Extend number of participating chambers towards Magnet Test goals limit to Sector 5 preference for ME2 and ME3 chambers Port software libraries to XDAQ v3 porting guide is now available April 25: follow-up on Emu-Central DAQ meeting Integrate PeripheralCrate Control in DCS
15
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 15 Slice Test Equipment Manifest (1) FebMarAprMayJunJulAugSepOct CSCs2461218243639 P.Crates111223455 TMB’044(10)+2+8+12?????? DMB3(9)+3+9+13+27+30 MPC’0411+1 +2+3+4 CCB’0421†1† +1+2+3+4 FED/DCC-+1 DDU1†1† 1†1† +1 +2 +3 †) old DDU will be temporarily hosted in dedicated “FAST”-site type peripheral crate (which needs its own CCB) see http://cern.ch/EmuSliceTest Off-chamber and FED electronics
16
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 16 Slice Test Equipment Manifest (2) FebMarAprMayJunJulAugSepOct P.Crates111223455 TF-CCB111 TF backplane111 SP111 MS111 TTCvi/ci+1 TTCvx+1 TTCex+1 ‡ +1 ‡) TTCvx can only supply 4 outputs. For more outputs a TTCex is required. see http://cern.ch/EmuSliceTest Trigger and TTC electronics
17
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 17 Magnet Test ~October/November 2005 60° sector of CSCs on ME+1, 2, 3 and 4 39 chambers, provided availability of off-chamber electronics Trigger: external and/or CSC TrackFinder FED: DCC read out over S-Link central DAQ DDU read out over spy channel local DAQ, local DQM
18
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 18 Fiber Duct Installation We have asked Luit Koert de Jong et al. to install fiber ducts for the Slice Test and Magnet Test EMU Fibers DAQ path = DMB-DDU + CrateController-Hub TRG path = TTC-CCB + MPC-SP all are multi-mode fibers with LC connectors except for TTC-CCB: single-mode with ST connectors From Slice Test towards Magnet Test: 60° ME2,3 sector, i.e. 2 crates. Patch panel will be on the YE+2 mini-rack (trigger sect.5) test various patch connector options Magnet Test 60° ME1-4 sector, i.e. 5 crates patch panel on YE+1
19
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 19 YE+2 49m 10m 18m 15m 20m SX5 Fiber Path for CMS-EMu -1- horizontal distances inside SX5 only current position slice test by-pass this alcove Counting House (see next page) YE+2 magnet test
20
UC Davis -- Feb. 25, 2005 F.Geurts -- EMu Slice Test 20 15m 8m SX5 Fiber Path for CMS-EMu -2- horizontal distances Counting House only office detectors magnet DAQ Counting House a.k.a. the Green Barrack