Presentation is loading. Please wait.

Presentation is loading. Please wait.

National Environmental Policy Act Environmental Engineer US Army Garrison.

Similar presentations


Presentation on theme: "National Environmental Policy Act Environmental Engineer US Army Garrison."— Presentation transcript:

1 National Environmental Policy Act Environmental Engineer US Army Garrison

2 1 May 03Environmental Quality Control Committee2 NEPA National Environmental Policy Act of 1969 US Army implementing regulation is AR 200-2

3 1 May 03Environmental Quality Control Committee3 NEPA Requirements 1.Consider environmental impacts of proposed actions 2.Evaluate alternative actions 3.Disclose actions/impacts to the public 4.Integrate public participation into the decision making process

4 1 May 03Environmental Quality Control Committee4 NEPA Process Documentation Record of Environmental Consideration (REC) – 1 page, cost minimal Environmental Assessment (EA) – 3-6 month process, cost $20K to $60K –FONSI –NOI Environmental Impact Statement (EIS) – 1-5 year process, $200K to $Ms –ROD

5 1 May 03Environmental Quality Control Committee5 Public Notification? REC – no EA – yes EIS – yes

6 1 May 03Environmental Quality Control Committee6 Project Proponents Early integration of NEPA required Responsible for funding NEPA documentation Fully involved in NEPA process

7 1 May 03Environmental Quality Control Committee7 Allegheny Power Substation EA Fluoridation of the Drinking Water EA Commissary/PX/Fire Station EA NIAID EIS Installation EA Recent NEPA Projects

8 1 May 03Environmental Quality Control Committee8 Conclusion 1.NEPA is a legal and a US Army requirement 2.Project proponents must be fully involved 3.Call x3152 if you have any questions


Download ppt "National Environmental Policy Act Environmental Engineer US Army Garrison."

Similar presentations


Ads by Google