John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.

Similar presentations


Presentation on theme: "John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt."— Presentation transcript:

1 John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt

2 Project: Modification of Gator for Handicap Accessibility Task assigned by John Deere is the open-ended modification of their six wheeled Gator Utility Vehicle to facilitate handicapped accessibility Two primary suggestions: wheelchair hoisting mechanism and controls modification

3 Review of Previous Action Items Continued contact with Bobby and other John Deere personnel to facilitate web conferencing with teams at other schools. Responsibility: Gary Twedt Informed that other school began school this week; the goal is to make contact with other schools this week or next week.

4 Review of Previous Action Items Continued updating of webpage with relevant documents. Responsibility: Gary Twedt Webpage has been updated to include the weekly deliverables from the first two weeks and relevant documents created by the previous team. Contact information has been updated for new team members.

5 Review of Previous Action Items Contact companies for information and advice on incorporating wheelchairs as the driver seat on the Gator vehicle and possibly obtain free equipment to test. Responsibility: Ben Spivey Met with a physical therapist from Emory’s Center for Rehabilitation Medicine and decided not to incorporate the wheelchair as a driver’s seat after discussion due to the customization needed for wheelchairs. Established connection with a representative from National Seating and Mobility. A folding wheelchair was donated by Diane Beckwith from ECRM.

6 Review of Previous Action Items Investigate preliminary design possibilities for implementation of steering wheel-controlled gas and brake pedals. Responsibility: Josh Ebeling Developed a couple ideas for a mechanical hand- controlled gas and brake system but decided that the wheelchair hoist was more suitable for this project. Team has decided to make the wheelchair hoist the primary objective but will leave open the possibility for designing handicapped-accessible controls permitted the primary objective is being met.

7 Review of Previous Action Items Investigate preliminary design possibilities for wheelchair hoisting mechanism. Responsibility: Mike Reno and James June Possibilities considered include placing the wheelchair on roll-bars mounted above passenger seats, placing it in the bed, or placing it in front of the passenger seat. Team has decided to move forward with a hoist located in the bed which will transfer the folded wheelchair into the bed behind the driver seat.

8 Problem Statement Product Idea: semi-automatic hoist that lifts wheelchair into bed while retaining a majority of bed storage space. Market Need: John Deere customers have requested an option to assist with transferring their wheelchairs into the Gator, a currently unavailable feature. Functional Goals: Lifting and lowering wheelchairs, positioning wheelchair, and collapsing hoist when not in use. Challenges: robustness under moment loading conditions, minimize usage of cargo space

9 Design Partition Grasping Function Challenges: wheelchairs disassemble when lifted, variance of wheelchair assemblies Folding Function Challenges: wheelchairs lifted by seat typically Lifting Function Challenges: moment loading, space limitations, power for automatic device

10 Design Partition Reverse Function Challenges: designing the device to reverse previously mentioned functions

11 Project Plan Project Responsibility Assignment Group Management: Gary Twedt CAD/FEA Support: Ben Spivey All members will be involved with concept development, drawing support, report writing, etc.

12 Project Plan Short-term Project Timeline 9/8- Complete 5 Conceptual Designs 9/15- Patent Search Completed Long-term Project Timeline 9/29- Mid-term Presentation 10/20- Engineering Analysis 11/24- Prototype Review Completed 12/1- Final Project Submitted

13 Current Action Items Conduct patent/product search for products similar to wheelchair hoist.Responsibility: All team members Develop at least five feasible concepts with written description, sketches, and analysis of advantages and disadvantages.