1 Direct Reduction Iron Plant Group Golf Selimos, Blake A. Arrington, Deisy C. Sink, Brandon Ciarlette, Dominic F. (Scribe) Advisor : Orest Romaniuk
2
Table of Contents » 3-4 Design Basis / Block Flow Diagram » 5 – Process Flow Diagram » 6 – Initial Control Scheme » 7-8 – Plant Layout » 9-11 – Calculations » 12-14 – Convection Section » 15-20 – Economics » 21-22 – Report » 23 - Summary 2
3
Block Flow/Design Basis 3
4
Design Basis 4
5
Process Flow Diagram 5
6
Initial Control Scheme 6
7
Plant Layout (1) 7 1 2 3 4 5 6 1.Ejector 2.HX -1 3.HX -2 4.Reformer 5.Oxy booster 6.Furnace 7.Storage 8.Tankage 9.Building Road Railroad Wind 7 7 9 7
8
8 Plant Layout (2)
9
Energy Balance Data and Equations 9
10
Calculation Summary 10
11
Heat Exchanger Calculations 11
12
Convection Section Issues 12
13
Convection Section Recommendations 13
14
Convection Section Recommendations 14
15
Equipment 15
16
Catalysts 16
17
Personnel EmployeesMan hours per day worked 7 Operators56 5 Engineers (shared with 3 plants)40/3 1 Complex manager (shared with whole plant)8/9 20 Administration (shared with whole plant)160/9 3 Safety (shared with whole plant)24/9 4 Medical staff (shared with plant)32/9 1 Maintenance (shared with plant)8/9 3 Supervisor24 Total120 17
18
Expenses 18
19
Revenue 19
20
Profit 20
21
Payback Period 21
22
Report 22
23
Report
24
Summary 24
25
25
26
References 26
27
Flow Diagram (1) 27
28
Flow Diagram (2) 28
29
Flow Diagram (3) 29
30
Flow Diagram (4) 30
31
31 Steam System