Presentation is loading. Please wait.

Presentation is loading. Please wait.

Grace Farms Photo collection from various sources Photo number included.

Similar presentations


Presentation on theme: "Grace Farms Photo collection from various sources Photo number included."— Presentation transcript:

1 Grace Farms Photo collection from various sources Photo number included

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35 Email Transmission Notes From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:47 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 053.jpg; Grace Farm June-july 2010 058.jpg; Grace Farm June-july 2010 059.jpg; Grace Farm June-july 2010 064.jpg; Grace Farm June- july 2010 072.jpg 053 – Concrete equipment crossing 058 – Contoured lower section of Trib 2 059 – Contoured Trib 2 064 - Rock Vane in Trib 1 072 – Repair of cattle access points on Wet Mill Creek From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:57 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 108.jpg; Grace Farm June-july 2010 109.jpg; Grace Farm June-july 2010 121.jpg; Grace Farm June-july 2010 125.jpg 108 – Repairs to section of Wet Mill Creek 109 - “ “ “ 121 – Final Trib 2 122 – Final Trib 2 From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:51 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 088.jpg; Grace Farm June-july 2010 091.jpg; Grace Farm June-july 2010 103.jpg; Grace Farm June-july 2010 105.jpg 088 – Final Trib 1 091 – Final Trib 1 103 – Final Trib 1 105 – One of two shade barns constructed as part of the project.

36 Email Transmission Notes From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:51 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 088.jpg; Grace Farm June-july 2010 091.jpg; Grace Farm June-july 2010 103.jpg; Grace Farm June-july 2010 105.jpg 088 – Final Trib 1 091 – Final Trib 1 103 – Final Trib 1 105 – One of two shade barns constructed as part of the project. From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:41 PM To: Christians, Susan D. Subject: Grace Attachments: DSCN0022.JPG; DSCN0035.JPG; DSCN0038.JPG; DSCN0039.JPG By the way, that first batch was all on Tributary 1 For this batch: 0011 – eroding banks, no trees, prior to mitigation 0035 – 0038 – 0039 – Constructing a high tech equipment crossing From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:33 PM To: Christians, Susan D. Subject: Grace Farm Attachments: DSCN0051.JPG; DSCN0053.JPG; DSCN0050.JPG; DSCN0009.JPG; DSCN0013.JPG From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:47 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 053.jpg; Grace Farm June-july 2010 058.jpg; Grace Farm June-july 2010 059.jpg; Grace Farm June-july 2010 064.jpg; Grace Farm June- july 2010 072.jpg 053 – Concrete equipment crossing 058 – Contoured lower section of Trib 2 059 – Contoured Trib 2 064 - Rock Vane in Trib 1 072 – Repair of cattle access points on Wet Mill Creek

37

38

39

40

41

42

43

44

45


Download ppt "Grace Farms Photo collection from various sources Photo number included."

Similar presentations


Ads by Google