Download presentation
Presentation is loading. Please wait.
Published byAlberta McDowell Modified over 9 years ago
1
Grace Farms Photo collection from various sources Photo number included
35
Email Transmission Notes From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:47 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 053.jpg; Grace Farm June-july 2010 058.jpg; Grace Farm June-july 2010 059.jpg; Grace Farm June-july 2010 064.jpg; Grace Farm June- july 2010 072.jpg 053 – Concrete equipment crossing 058 – Contoured lower section of Trib 2 059 – Contoured Trib 2 064 - Rock Vane in Trib 1 072 – Repair of cattle access points on Wet Mill Creek From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:57 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 108.jpg; Grace Farm June-july 2010 109.jpg; Grace Farm June-july 2010 121.jpg; Grace Farm June-july 2010 125.jpg 108 – Repairs to section of Wet Mill Creek 109 - “ “ “ 121 – Final Trib 2 122 – Final Trib 2 From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:51 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 088.jpg; Grace Farm June-july 2010 091.jpg; Grace Farm June-july 2010 103.jpg; Grace Farm June-july 2010 105.jpg 088 – Final Trib 1 091 – Final Trib 1 103 – Final Trib 1 105 – One of two shade barns constructed as part of the project.
36
Email Transmission Notes From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:51 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 088.jpg; Grace Farm June-july 2010 091.jpg; Grace Farm June-july 2010 103.jpg; Grace Farm June-july 2010 105.jpg 088 – Final Trib 1 091 – Final Trib 1 103 – Final Trib 1 105 – One of two shade barns constructed as part of the project. From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:41 PM To: Christians, Susan D. Subject: Grace Attachments: DSCN0022.JPG; DSCN0035.JPG; DSCN0038.JPG; DSCN0039.JPG By the way, that first batch was all on Tributary 1 For this batch: 0011 – eroding banks, no trees, prior to mitigation 0035 – 0038 – 0039 – Constructing a high tech equipment crossing From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:33 PM To: Christians, Susan D. Subject: Grace Farm Attachments: DSCN0051.JPG; DSCN0053.JPG; DSCN0050.JPG; DSCN0009.JPG; DSCN0013.JPG From: Todd Hughes [thughes@emetn.com] Sent: Friday, July 09, 2010 2:47 PM To: Christians, Susan D. Subject: Grace Attachments: Grace Farm June-july 2010 053.jpg; Grace Farm June-july 2010 058.jpg; Grace Farm June-july 2010 059.jpg; Grace Farm June-july 2010 064.jpg; Grace Farm June- july 2010 072.jpg 053 – Concrete equipment crossing 058 – Contoured lower section of Trib 2 059 – Contoured Trib 2 064 - Rock Vane in Trib 1 072 – Repair of cattle access points on Wet Mill Creek
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.