ÆON (M) PTC Integration Progress Report - PTC Integration Import Carrot Report ÆON Big PTC Progress Report ÆON GLOBAL SCM Sdn. Bhd. (1025615-V)
2
2 ÆON (M) PTC – Project Schedule (as at 23 rd OCT 2013) No.Action 20132014 Oct NovDec Jan Feb Mar Apr May Jun Jul AugSep 1PC – PTC Trial Run 2Profit System UAT Test D&D 3SOS Confirms flow PC – PTC 4PTC – Out Bound Chit Printing 5PTC IT Infra Setup 6MMD Meeting Information 7Kick Off PC delivery by PTC 8Profit System – PTC Fee 9Kick Off – D&D Receiving 10D&D – Growth Phase 1 11D&D – Growth Phase 2 12D&D – Growth Phase 3 13D&D Growth Complete * - No progress at the moment. PC & Nestle PTC 20.4% 13.8% 32.7%
3
3 ÆON (M) PTC Trial Run – Logistic Flow PC (Metro Prima) PTC AEON TM Supplier PC loads 6 plastic pallet with cargo into frozen & chilled compartment. Store side unload all cargo with pallet. Truck returns EMPTY. Store side returns empty PC delivery material (include plastic pallet) onto PC lorry on 2 nd wave delivery on 26 th OCT 2013. ETA: 03:30 ETD: 04:00 ETA: 08:00 ETD: 08:30 ETA: 05:00 ETD: 06:30 ETD: 02:30
4
4 ÆON (M) PTC Trial Run – Arrangement (8 pallet)(4 pallet) - EMPTY - Bakery Dough Meat - EMPTY - Fish Vegetables & Fruits Vegetables & Fruits Vegetables & Fruits Vegetables & Fruits Vegetables & Fruits Delica Mr. Donut & Bakery RTE (10ºC ~ 8ºC)(-15ºC ~ -18ºC) - as to comply with TQM Dept.’s requirement to avoid cross contamination, minimum gap of 3 feet required; as per highlighted in green. Trial
5
5 ÆON TopValu (M) – Direct Import Carrot Port Klang to Re-Packing Centre Quality checking & trimming process. Weightage and re- packing with private label. Completed processed keep storage at Euro- Atlantic. Current ProcessNew Proposed Process Port Klang to Re-Packing Centre Quality checking & trimming process. Weightage and re- packing with private label. Completed processed keep storage at AEON Perishable Centre. Current Loss 5% 2 year ago Loss 10%
6
6 ÆON Big *(CDC) – Schedule Proposal (as at 23 rd OCT 2013) Sta ge No.Action 20132014 Oct NovDec Jan Feb Mar Apr May Jun 1 1Understand function request 2Study – ABSB current process 3Study – ABSB expectation 4ABSB Volume Commitment 5Draft of ACDC overall design 6List-up New 3PL Company 2 73PL Briefing Session 8Tender (1 st Round) 9Presentation (2 nd Round) 10Presentation (Final Round) 11Nominate 3PL Company 12P&L Projection Planning 13Approval for new 3PL
7
7 ÆON Big *(CDC) – Schedule Proposal (as at 23 rd OCT 2013) Sta ge No.Action 20132014 Oct NovDec Jan Feb Mar Apr May Jun 3 14Concentrate operation detail 15Prepare facility & trucks 16Education PTC staff 17Approval terms & condition 4 18Negotiate all supplier 19Contract with all supplier 520 ÆON CDC LIVE *(Target Proposal)